Schedule 1: GCU Response to General Concerns stated in TFTO Submission<br />

GCU Response to TFTO Submission<br />

TFTO<br />

Submission<br />

(TFTO Section<br />

reference)<br />

Overview<br />

(Section 1)<br />

Inadequate First<br />

Nation<br />

Consultation<br />

(Section 1.2)<br />

Major concerns<br />

(Section 2.2)<br />

Lack of a Good<br />

Neighbour Policy<br />

(Section 4.1)<br />

GCU Response<br />

The TFTO Submission repeatedly refers to clearing of 645 km 2 of forested<br />

land and this is incorrect. The entire 43 km road corridor would require<br />

0.645 km 2 of clearing over a 43km corridor (43 km x 0.015 km). Of this<br />

0.645 km 2 of proposed clearing, approximately 0.33 km 2 is already<br />

approved to be cleared in the Trout Lake Forest Management Plan<br />

(approximately 22km x 0.015 km).<br />

The record of stakeholder consultations is included in the final ESR.<br />

The TFTO Submission speculates about potential impacts of the<br />

development of a mine. That speculation is beyond the scope of this ESR.<br />

If GCU seeks to develop the Springpole <strong>Gold</strong> project into a mine, a new<br />

environmental assessment process that will assess the broader impacts<br />

and benefits of such a development.<br />

The record of stakeholder consultations is included in the final ESR.<br />

The Crown has a legal obligation to consult Aboriginal groups. GCU has<br />

performed some of the procedural aspects of that consultation as<br />

delegated by the Crown. Those consultations are set out in detail in the<br />

final ESR. GCU remains strongly committed to working with Aboriginal<br />

groups whose Aboriginal and/or Treaty Rights may be affected by GCU’s<br />

activities.<br />

The issues noted in the TFTO Submission are dealt with in the final ESR<br />

and reasonable mitigation measures are proposed in the final ESR (see<br />

Tables 3.1 and 3.2 final ESR).<br />

GCU is willing to agree to a good neighbour policy with TFTO. In<br />

November 2012, a TFTO representative agreed to prepare a draft policy<br />

for discussion between GCU and TFTO. GCU has confirmed its<br />

willingness to agree to such a policy in subsequent discussion with TFTO,<br />

but nothing further has been proposed to date. Entering into such an<br />

agreement is a commitment in the final ESR.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 1/- 1-