Springpole_GenericSedInstall_____________________________________________________10July2013<br />

• How to install and monitor the control measures<br />

Installation<br />

1. No digging, grubbing or ditching will occur within the flood plain or 30 m past the flood plain.<br />

2. No debris will be dropped in the stream any debris that inadvertently falls into the stream will be<br />

removed.<br />

3. Snow and ice will be removed from the work area.<br />

4. The culvert installation will be in the wet for all cool water streams.<br />

5. For those streams that are determined to be cool water (no in water work from September 15<br />

to June1) culvert installation will be in the dry by using sand bag coffer dam as outlined in the<br />

MNR NEST Field Guide - Instream Sediment Control Techniques Field Implementation Manual<br />

and illustrated in outlined in Figure 2.<br />

6. As required, silt fences constructed of staked geotextile will be placed along the road edges to<br />

keep material from entering the creek. The silt fences will be long enough to cover the work<br />

area i.e. excavator work area and stock pile area. The silt fences will be the standard width of a<br />

geotextile roll (1m).<br />

7. Measurements downstream of water depth will be verified and the excavator will ensure the<br />

depth of the culvert will be 40% below this level.<br />

8. The appropriate culvert for the crossing as outlined in Figure 1 will be installed 40% into the<br />

stream bed.<br />

9. The grade of the culvert will reflect the grade of the natural stream bed.<br />

10. If the stream bed is rocky the culvert will be placed on top of the rock/bedrock.<br />

11. Erosion resistant gravel will be used to pack around the culvert as shown in Figure 3.<br />

12. The excavator will back fill the gravel in 300mm layers and pack each layer before adding the<br />

next layer.<br />

Long Term Erosion control<br />

1. A layer of coarse erosion resistant crushed granular B gravel will be used to cover and crown<br />

the road.<br />

2. All slopes will be left at 2:1.<br />

3. Acid free rip rap of various sizes will be used to stabilize the culvert ends as shown in Figure 3<br />

Step 4 -5. Any exposed areas will be seeded with an approved seed mix and/or local organic<br />

material and vegetation.<br />

4. As required diversion ditches or berms will be used to direct water into sediment settling<br />

structures (slash, settling holes, natural vegetation)<br />

Reclamation and Rehabilitation<br />

The following steps will occur:<br />

1. The rip rap will be excavated and stockpiled on the road for use after the culvert removal.<br />

2. All material used to cover the culvert will be removed and transported from the crossing site and<br />

spread along the existing road in a 20 cm deep layer.<br />

3. The culvert will be removed and disposed of at a proper recycling centre.<br />

4. Measurements of water depth will be taken up/down stream from the crossing. An average<br />

water depth will be calculated.<br />

5. The stream bed at the crossing will be left at the average calculated depth.<br />

6. The slopes from the stream will be pulled back and sloped at 2:1 or greater to minimize water<br />

erosion.<br />

7. The rip rap will be used along the water edge to form a protective barrier 25 long by 1m wide<br />

and .20-.30 m deep.<br />

______________________________________________________________3 of 11