Springpole_GenericSedInstall_____________________________________________________10July2013<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc Springpole Project Access Road:<br />

Generic Sediment Control and Installation Plan<br />

Crossings # 2,3,4,5,6,8,9,10,11,12,13,14<br />

Date: 10 July 2013<br />

Prepared by: Steve Bros, R.P.F., Merin Forest Management<br />

1.0 Purpose<br />

This Generic Sediment Control and Installation Plan will be used for Crossings<br />

# 2,3,4,5,6,8,9,10,11,12,13,14 as identified on the Springpole Road ROW corridor map in the Bruce<br />

Adamson Water Crossing <strong>Report</strong> Springpole Road (October 21, 2012).<br />

Crossing 2 to 6 are located within the Trout Lake Forest FMP approved Wenasaga Road Corridor.<br />

These crossings will be constructed to the primary road standards outlined in the FMP and the<br />

Domtar Standard Operating Procedures (a copy is supplied as a supplementary document – Domtar<br />

Road Construction SOP)<br />

2.0 Applicable Guidelines for Project<br />

In addition to the Domtar Standard Operating Procedures, the following MNR Guideline Manuals and<br />

Department of Fisheries and Oceans (DFO) Operational Statements will be on site for reference by<br />

the Site Supervisor:<br />

• The <strong>Environmental</strong> Guidelines for Access Roads and Water Crossings (1995),<br />

• Engineering Northeast Region Culvert Sizing at Water Crossings (1998),<br />

• Crown Land Bridge Management Guidelines (2007),<br />

• CSP Culvert Installation at Water Crossings on Forest Access Roads (1996),<br />

• Erosion and Sediment Control at Water Crossings on Forest Access Roads Field Card (2000)<br />

• MNR Guidelines for Culverts Installed in the Winter (1996)<br />

• Instream Sediment Control Techniques Field Implementation Manual (1996)<br />

• DFO operational statements<br />

• Culvert Maintenance Ver 3.0<br />

• Ice Bridge and Snow Fills Ver 3.0<br />

• Clear Span Bridges Ver 3.0<br />

• Bridge Maintenance Ver 3.0<br />

• Timing Windows Ver 1.0<br />

3.0 Project Administration and Scheduling<br />

Personnel involved in this winter road construction and stream crossing installations will be instructed<br />

on the procedures in this plan prior to the start of the project. This instruction will be completed by the<br />

onsite project supervisor who will:<br />

1. Have MNR stream crossing training on sediment control and culvert installation.<br />

2. Have training on operational application of the MNR Stand and Site Guide.<br />

3. Be a certified forest operations compliance inspector.<br />

4. Be experienced in forest operations, winter road construction and stream crossings.<br />

The crossing installation will occur upon MNR approval and is tentatively scheduled for the period 1<br />

October 2013 to 31 March 2014. The crossings are all classified as cool water.<br />

______________________________________________________________1 of 11