<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Springpole <strong>Gold</strong> Access Corridor Project<br />

<strong>Final</strong> <strong>Environmental</strong> <strong>Study</strong> <strong>Report</strong><br />

Net Effect<br />

Screening Criteria<br />

Or create excessive<br />

waste materials<br />

Or commit a significant<br />

amount of a nonrenewable<br />

resource (e.g.<br />

aggregates, farm land)<br />

Noise levels X<br />

Negative Effect (1) Positive Effect (1)<br />

Nil Unk<br />

High Med Low Low Med High<br />

X<br />

X<br />

Comments and Rationale<br />

Project would not create excessive waste materials. Waste from the exploration site would continue to be containerized to avoid<br />

attracting wildlife and shipped off-site for disposal at a MOE approved facility.<br />

Minor amount of aggregate from FAPs and GCU’s patented land to be utilized for water crossings associated with road. This would not<br />

result in increased resource scarcity for other aggregate users. The only other aggregate user is the SFL holder and any aggregate<br />

removed from FAPs will be used on the FMP Approved Road.<br />

Noise impacts will be highest during the construction phase, which is planned during winter months to avoid active period of tourism<br />

operators, caribou calving window and breeding bird nesting period.<br />

Views or aesthetics X Bridge over Birch River would be highly visible to local boaters and could not be mitigated as effectively as eastern corridor alternative.<br />

Or be a pre-condition or<br />

justification for<br />

This Project is a stand-alone subset of the on-going Springpole <strong>Gold</strong> Project. The other aspects of the Springpole <strong>Gold</strong> Project are not<br />

X<br />

implementing another<br />

included in the scope of this Class EA.<br />

project<br />

Adjacent or nearby uses,<br />

persons or property<br />

Social, Cultural and Economic Considerations<br />

Cultural heritage<br />

resources-including<br />

archaeological sites,<br />

X<br />

built heritage and<br />

cultural heritage<br />

landscapes<br />

Or displace people,<br />

businesses, institutions<br />

or public facilities<br />

Community character,<br />

enjoyment of property or<br />

local amenities<br />

Or increase demands on<br />

government services or<br />

infrastructure<br />

Public health and/or<br />

safety<br />

X<br />

X<br />

X Not applicable.<br />

X Not applicable.<br />

X<br />

Project maintains a reasonably large setback from remote tourism operators and private landowners, similar to setbacks elsewhere in<br />

the SFL.<br />

Regionally, this corridor would exert greater cumulative effects because it would duplicate the access corridor of the 2014-2019 FMP.<br />

Based on desktop analysis by licensed professional archaeologist, there is an increased potential for archaeological values along this<br />

corridor (refer to Appendix 2).<br />

Engagement with tourism operators and private landowners is on-going in order to address concerns that arise. As indicated in Table<br />

3-2, GCU is receptive to good neighbour policy, Resource Stewardship Agreement and participation in a stakeholder working group.<br />

Increased access to lakes could be a positive effect for private landowners if access is authorized by MNR. This alternative would<br />

potentially increase unwanted access to Birch Lake, a valued tourist lake, because this alternative comes to within several hundred<br />

metres of the shoreline. GCU notes that it has engaged local interests as well as regional interests, as indicated in Appendix 3.<br />

Safety of the public will be somewhat increased because of ability to evacuate areas year-round by a land-based corridor in case of fire,<br />

or medical emergencies. Consistent with GCU’s track record of being helpful to other parties in the region, access will be arranged by<br />

GCU personnel for other stakeholders in the area in the event of an emergency situation.<br />

Local, regional or<br />

provincial economies or<br />

businesses<br />

X Enhanced employment and contracting opportunities, procurement of goods and services, training opportunities.<br />

July 2013 Page 11