SENT BY E-MAIL ATTACHMENT Adamson Consulting The Water Crossing Specialist 126 Prospect Ave. Thunder Bay, ON P7A 5L4 (807) 345-7073 adamsonb@shaw.ca October 18, 2012 Gold Canyon Resources Inc. Suite 810, 609 Granville Street P.O. Box 10356, Pacific Centre Vancouver, BC, V7Y 1G5 Attention: Mr. Darryl Boyd SUBJECT: Bridge Design Package for Deaddog Creek Bridge, Proposed Springpole Road As requested to accommodate DFO’s desire to avoid any constriction of the channels, we changed the proposed crossing structure for culverts to a bridge. I did not have the opportunity to visit the site, but have reviewed measurements, comments and photos provided by Len Hercun and Kyle Emslie. Then we completed a bridge design package suitable for you to submit to DFO and MNR for approvals. Attached are the following documents that make up the design package. Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, Oct 13/12 Bridge Design Record Form, Oct 13/12 Bridge Site Data Form, Oct 13/12 Crib Round Summary, Oct 13/12 Material Lists, Oct 13/12 Please call if there are any questions or if we can be of further assistance. Yours truly, Bruce Adamson, P. Eng

Bridge Design Record Form Bridge Information Permanent Bridge Temporary Bridge Crossing No. River Crossing Name Deaddog Creek Bridge Contractor/Builder Name To be determined Standard Construction Drawings Used for Bridge: MNR Standard Bridge Drawings, 2008 UTM or Lat/Long Location N51 o 14.345’, W92 o 09.248’ UTM 15 U 569048 5676753 Road Name Springpole Trail MNR Region Northwest Region Forest Management Unit (FMU) Trout Lake Forest Bridge Length: 30 feet MNR District (Area) Red Lake Site Specific Bridge Drawings (if applicable): Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, dated Oct 13/12 Streambed to Soffit: 7.0 feet Portable Bridge Identification Number: n/a Bridge Owner Information Bridge Owner Name Owner’s Contact Name Gold Canyon Resources Darryl Boyd Mailing Address Suite 810, 609 Granville Street P.O. Box 10356, Pacific Centre Vancouver, BC, V7Y 1G5 Home Phone 519-746-2624, Cell 519-616-2624 Fax Number Email Address d.h.boyd@sympatico.ca This form was completed by the person responsible for the bridge, who is: Owner’s Representative Professional Engineer Competent Project Co-ordinator (for temporary bridges only) (for any bridges) (for bridges using standard designs) Name: Robert Bruce Adamson P.Eng. Registration No. (if applicable) : 235010 Phone No. 807-345-7073 Company Name: Adamson Consulting Fax No. Mailing Address: 126 Prospect Ave. Thunder Bay, ON, P7A 5L4 Email address adamsonb@shaw.ca The undersigned confirms that the bridge structure referred above conforms to the requirements specified in the MNR document titled ‘Crown Land Bridge Management Guidelines”. Signature Date Signed October 13, 2012

SENT BY E-MAIL ATTACHMENT<br />

Adamson Consulting<br />

The Water Crossing Specialist<br />

126 Prospect Ave.<br />

Thunder Bay, ON<br />

P7A 5L4<br />

(807) 345-7073<br />

adamsonb@shaw.ca<br />

October 18, 2012<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Suite 810, 609 Granville Street<br />

P.O. Box 10356, Pacific Centre<br />

Vancouver, BC, V7Y 1G5<br />

Attention: Mr. Darryl Boyd<br />

SUBJECT:<br />

Bridge Design Package for Deaddog Creek Bridge, Proposed Springpole Road<br />

As requested to accommodate DFO’s desire to avoid any constriction of the channels, we<br />

changed the proposed crossing structure for culverts to a bridge. I did not have the opportunity<br />

to visit the site, but have reviewed measurements, comments and photos provided by Len<br />

Hercun and Kyle Emslie.<br />

Then we completed a bridge design package suitable for you to submit to DFO and MNR for<br />

approvals.<br />

Attached are the following documents that make up the design package.<br />

Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, Oct 13/12<br />

Bridge Design Record Form, Oct 13/12<br />

Bridge Site Data Form, Oct 13/12<br />

Crib Round Summary, Oct 13/12<br />

Material Lists, Oct 13/12<br />

Please call if there are any questions or if we can be of further assistance.<br />

Yours truly,<br />

Bruce Adamson, P. Eng