SENT BY E-MAIL ATTACHMENT Adamson Consulting The Water Crossing Specialist 126 Prospect Ave. Thunder Bay, ON P7A 5L4 (807) 345-7073 adamsonb@shaw.ca October 18, 2012 Gold Canyon Resources Inc. Suite 810, 609 Granville Street P.O. Box 10356, Pacific Centre Vancouver, BC, V7Y 1G5 Attention: Mr. Darryl Boyd SUBJECT: Bridge Design Package for Deaddog Creek Bridge, Proposed Springpole Road As requested to accommodate DFO’s desire to avoid any constriction of the channels, we changed the proposed crossing structure for culverts to a bridge. I did not have the opportunity to visit the site, but have reviewed measurements, comments and photos provided by Len Hercun and Kyle Emslie. Then we completed a bridge design package suitable for you to submit to DFO and MNR for approvals. Attached are the following documents that make up the design package. Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, Oct 13/12 Bridge Design Record Form, Oct 13/12 Bridge Site Data Form, Oct 13/12 Crib Round Summary, Oct 13/12 Material Lists, Oct 13/12 Please call if there are any questions or if we can be of further assistance. Yours truly, Bruce Adamson, P. Eng
Bridge Design Record Form Bridge Information Permanent Bridge Temporary Bridge Crossing No. River Crossing Name Deaddog Creek Bridge Contractor/Builder Name To be determined Standard Construction Drawings Used for Bridge: MNR Standard Bridge Drawings, 2008 UTM or Lat/Long Location N51 o 14.345’, W92 o 09.248’ UTM 15 U 569048 5676753 Road Name Springpole Trail MNR Region Northwest Region Forest Management Unit (FMU) Trout Lake Forest Bridge Length: 30 feet MNR District (Area) Red Lake Site Specific Bridge Drawings (if applicable): Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, dated Oct 13/12 Streambed to Soffit: 7.0 feet Portable Bridge Identification Number: n/a Bridge Owner Information Bridge Owner Name Owner’s Contact Name Gold Canyon Resources Darryl Boyd Mailing Address Suite 810, 609 Granville Street P.O. Box 10356, Pacific Centre Vancouver, BC, V7Y 1G5 Home Phone 519-746-2624, Cell 519-616-2624 Fax Number Email Address d.h.boyd@sympatico.ca This form was completed by the person responsible for the bridge, who is: Owner’s Representative Professional Engineer Competent Project Co-ordinator (for temporary bridges only) (for any bridges) (for bridges using standard designs) Name: Robert Bruce Adamson P.Eng. Registration No. (if applicable) : 235010 Phone No. 807-345-7073 Company Name: Adamson Consulting Fax No. Mailing Address: 126 Prospect Ave. Thunder Bay, ON, P7A 5L4 Email address adamsonb@shaw.ca The undersigned confirms that the bridge structure referred above conforms to the requirements specified in the MNR document titled ‘Crown Land Bridge Management Guidelines”. Signature Date Signed October 13, 2012
- Page 188 and 189: All of the culvert sizes recommende
- Page 190 and 191: 2. At present, the planned winter i
- Page 192 and 193: Table 2 - Water Crossing Hydrology
- Page 194 and 195: Map 2 - Water Crossings in Northern
- Page 196 and 197: Photo 3 - Site #2 indicates propose
- Page 198 and 199: - 2 - 7. In the spring, when the fr
- Page 200 and 201: Photo 1: Facing North at original f
- Page 202 and 203: Photo 3: Facing East at Biologist
- Page 204 and 205: Photo 5: Facing West at Biologist
- Page 206 and 207: CROSSING 2 SPRINPOLE ROAD - SITE PI
- Page 208 and 209: CROSSING 3 SPRINPOLE ROAD - SITE PI
- Page 210 and 211: CROSSING 4 SPRINPOLE ROAD - SITE PI
- Page 212 and 213: CROSSING 5 SPRINPOLE ROAD - SITE PI
- Page 214 and 215: CROSSING 6 SPRINPOLE ROAD - SITE PI
- Page 216: CROSSING 7 - Birch River Crossing 1
- Page 219 and 220: Photo 3: Taken facing the West on t
- Page 221 and 222: Photo 5: Taken facing South of East
- Page 223 and 224: Photo 7: Taken facing the North app
- Page 225 and 226: CROSSING 8 SPRINPOLE ROAD ( EAST EN
- Page 227 and 228: CROSSING 9 SPRINPOLE ROAD ( EAST EN
- Page 229 and 230: CROSSING 10 SPRINPOLE ROAD - SITE P
- Page 231 and 232: CROSSING 11 SPRINPOLE ROAD - SITE P
- Page 233 and 234: CROSSING 12 SPRINPOLE ROAD - SITE P
- Page 235 and 236: CROSSING 13 SPRINPOLE ROAD - SITE P
- Page 237 and 238: CROSSING 14 SPRINPOLE ROAD - SITE P
- Page 242: BRIDGE SITE DATA FORM - EXISTING CO
- Page 245 and 246: Materials - 30' Deaddog Creek Bridg
- Page 247 and 248: Canada flow gauge on the Cat River,
- Page 249 and 250: Crown Land Bridge Management Guidel
- Page 251: Photo 3 - Site #2 indicates propose
- Page 254 and 255: Springpole_GenericSedInstall_______
- Page 256 and 257: Springpole_GenericSedInstall_______
- Page 258 and 259: Springpole_GenericSedInstall_______
- Page 260 and 261: Springpole_GenericSedInstall_______
- Page 262 and 263: Springpole_GenericSedInstall_______
- Page 264 and 265: Springpole_GenericSedInstall_______
- Page 266 and 267: Comments Received at Open Houses co
- Page 268 and 269: Comments Received at Open Houses co
- Page 270 and 271: APPENDIX 9 9A: SUBMISSION FROM TROU
- Page 272 and 273: Gold Canyon Resources Inc: Final En
- Page 274 and 275: Gold Canyon Resources Inc: Final En
- Page 276 and 277: Gold Canyon Resources Inc: Final En
- Page 278 and 279: Gold Canyon Resources Inc: Final En
- Page 280 and 281: Gold Canyon Resources Inc: Final En
- Page 282 and 283: Gold Canyon Resources Inc: Final En
- Page 284 and 285: Gold Canyon Resources Inc: Final En
- Page 286 and 287: Gold Canyon Resources Inc: Final En
- Page 288 and 289: Gold Canyon Resources Inc: Final En
SENT BY E-MAIL ATTACHMENT<br />
Adamson Consulting<br />
The Water Crossing Specialist<br />
126 Prospect Ave.<br />
Thunder Bay, ON<br />
P7A 5L4<br />
(807) 345-7073<br />
adamsonb@shaw.ca<br />
October 18, 2012<br />
<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />
Suite 810, 609 Granville Street<br />
P.O. Box 10356, Pacific Centre<br />
Vancouver, BC, V7Y 1G5<br />
Attention: Mr. Darryl Boyd<br />
SUBJECT:<br />
Bridge Design Package for Deaddog Creek Bridge, Proposed Springpole Road<br />
As requested to accommodate DFO’s desire to avoid any constriction of the channels, we<br />
changed the proposed crossing structure for culverts to a bridge. I did not have the opportunity<br />
to visit the site, but have reviewed measurements, comments and photos provided by Len<br />
Hercun and Kyle Emslie.<br />
Then we completed a bridge design package suitable for you to submit to DFO and MNR for<br />
approvals.<br />
Attached are the following documents that make up the design package.<br />
Drawing 1 of 1, General Arrangement Drawing, Adamson Consulting, Oct 13/12<br />
Bridge Design Record Form, Oct 13/12<br />
Bridge Site Data Form, Oct 13/12<br />
Crib Round Summary, Oct 13/12<br />
Material Lists, Oct 13/12<br />
Please call if there are any questions or if we can be of further assistance.<br />
Yours truly,<br />
Bruce Adamson, P. Eng