Revised Final Environmental Study Report (24 MB) - Gold Canyon ...
Revised Final Environmental Study Report (24 MB) - Gold Canyon ... Revised Final Environmental Study Report (24 MB) - Gold Canyon ...
06.05.2015
Views
APPENDIX 7 7B: BRIDGE CONSTRUCTION DETAILS
- Page 188 and 189: All of the culvert sizes recommende
- Page 190 and 191: 2. At present, the planned winter i
- Page 192 and 193: Table 2 - Water Crossing Hydrology
- Page 194 and 195: Map 2 - Water Crossings in Northern
- Page 196 and 197: Photo 3 - Site #2 indicates propose
- Page 198 and 199: - 2 - 7. In the spring, when the fr
- Page 200 and 201: Photo 1: Facing North at original f
- Page 202 and 203: Photo 3: Facing East at Biologist
- Page 204 and 205: Photo 5: Facing West at Biologist
- Page 206 and 207: CROSSING 2 SPRINPOLE ROAD - SITE PI
- Page 208 and 209: CROSSING 3 SPRINPOLE ROAD - SITE PI
- Page 210 and 211: CROSSING 4 SPRINPOLE ROAD - SITE PI
- Page 212 and 213: CROSSING 5 SPRINPOLE ROAD - SITE PI
- Page 214 and 215: CROSSING 6 SPRINPOLE ROAD - SITE PI
- Page 216: CROSSING 7 - Birch River Crossing 1
- Page 219 and 220: Photo 3: Taken facing the West on t
- Page 221 and 222: Photo 5: Taken facing South of East
- Page 223 and 224: Photo 7: Taken facing the North app
- Page 225 and 226: CROSSING 8 SPRINPOLE ROAD ( EAST EN
- Page 227 and 228: CROSSING 9 SPRINPOLE ROAD ( EAST EN
- Page 229 and 230: CROSSING 10 SPRINPOLE ROAD - SITE P
- Page 231 and 232: CROSSING 11 SPRINPOLE ROAD - SITE P
- Page 233 and 234: CROSSING 12 SPRINPOLE ROAD - SITE P
- Page 235 and 236: CROSSING 13 SPRINPOLE ROAD - SITE P
- Page 237: CROSSING 14 SPRINPOLE ROAD - SITE P
- Page 241 and 242: Bridge Design Record Form Bridge In
- Page 244 and 245: Crib Round Summary Table - 30' Dead
- Page 246 and 247: Project Description for Submission
- Page 248 and 249: 4. The approach ramp on the accessi
- Page 250 and 251: Photo 1: Birch River crossing site,
- Page 253 and 254: APPENDIX 7 7C: SEDIMENT CONTROL PLA
- Page 255 and 256: Springpole_GenericSedInstall_______
- Page 257 and 258: Springpole_GenericSedInstall_______
- Page 259 and 260: Springpole_GenericSedInstall_______
- Page 261 and 262: Springpole_GenericSedInstall_______
- Page 263 and 264: Springpole_GenericSedInstall_______
- Page 265 and 266: APPENDIX 8 SUMMARY OF COMMENTS ARIS
- Page 267 and 268: Comments Received at Open Houses co
- Page 269 and 270: Comments Received at Open Houses co
- Page 271 and 272: Gold Canyon Resources Inc: Final En
- Page 273 and 274: Table of Contents Gold Canyon Resou
- Page 275 and 276: Gold Canyon Resources Inc: Final En
- Page 277 and 278: Gold Canyon Resources Inc: Final En
- Page 279 and 280: Gold Canyon Resources Inc: Final En
- Page 281 and 282: Gold Canyon Resources Inc: Final En
- Page 283 and 284: Gold Canyon Resources Inc: Final En
- Page 285 and 286: Gold Canyon Resources Inc: Final En
- Page 287 and 288: Gold Canyon Resources Inc: Final En
APPENDIX 7<br />
7B: BRIDGE CONSTRUCTION<br />
DETAILS