Revised Final Environmental Study Report (24 MB) - Gold Canyon ...
Revised Final Environmental Study Report (24 MB) - Gold Canyon ... Revised Final Environmental Study Report (24 MB) - Gold Canyon ...
CROSSING 12 SPRINPOLE ROAD - SITE PICTURES TAKEN APRIL 2012 GOLD CANYON RESOURCES CREEK LOCATION CREEK LOCATION 36
CROSSING 13 SPRINPOLE ROAD - SITE PICTURES TAKEN APRIL 2012 GOLD CANYON RESOURCES STREAM SIMULATION CULVERT SIZE = 1000MM 37
- Page 184 and 185: APPENDIX 7 7A: WATER CROSSINGS ENGI
- Page 186 and 187: The 25-year flood (Q 25 ), determin
- Page 188 and 189: All of the culvert sizes recommende
- Page 190 and 191: 2. At present, the planned winter i
- Page 192 and 193: Table 2 - Water Crossing Hydrology
- Page 194 and 195: Map 2 - Water Crossings in Northern
- Page 196 and 197: Photo 3 - Site #2 indicates propose
- Page 198 and 199: - 2 - 7. In the spring, when the fr
- Page 200 and 201: Photo 1: Facing North at original f
- Page 202 and 203: Photo 3: Facing East at Biologist
- Page 204 and 205: Photo 5: Facing West at Biologist
- Page 206 and 207: CROSSING 2 SPRINPOLE ROAD - SITE PI
- Page 208 and 209: CROSSING 3 SPRINPOLE ROAD - SITE PI
- Page 210 and 211: CROSSING 4 SPRINPOLE ROAD - SITE PI
- Page 212 and 213: CROSSING 5 SPRINPOLE ROAD - SITE PI
- Page 214 and 215: CROSSING 6 SPRINPOLE ROAD - SITE PI
- Page 216: CROSSING 7 - Birch River Crossing 1
- Page 219 and 220: Photo 3: Taken facing the West on t
- Page 221 and 222: Photo 5: Taken facing South of East
- Page 223 and 224: Photo 7: Taken facing the North app
- Page 225 and 226: CROSSING 8 SPRINPOLE ROAD ( EAST EN
- Page 227 and 228: CROSSING 9 SPRINPOLE ROAD ( EAST EN
- Page 229 and 230: CROSSING 10 SPRINPOLE ROAD - SITE P
- Page 231 and 232: CROSSING 11 SPRINPOLE ROAD - SITE P
- Page 233: CROSSING 12 SPRINPOLE ROAD - SITE P
- Page 237 and 238: CROSSING 14 SPRINPOLE ROAD - SITE P
- Page 240 and 241: SENT BY E-MAIL ATTACHMENT Adamson C
- Page 242: BRIDGE SITE DATA FORM - EXISTING CO
- Page 245 and 246: Materials - 30' Deaddog Creek Bridg
- Page 247 and 248: Canada flow gauge on the Cat River,
- Page 249 and 250: Crown Land Bridge Management Guidel
- Page 251: Photo 3 - Site #2 indicates propose
- Page 254 and 255: Springpole_GenericSedInstall_______
- Page 256 and 257: Springpole_GenericSedInstall_______
- Page 258 and 259: Springpole_GenericSedInstall_______
- Page 260 and 261: Springpole_GenericSedInstall_______
- Page 262 and 263: Springpole_GenericSedInstall_______
- Page 264 and 265: Springpole_GenericSedInstall_______
- Page 266 and 267: Comments Received at Open Houses co
- Page 268 and 269: Comments Received at Open Houses co
- Page 270 and 271: APPENDIX 9 9A: SUBMISSION FROM TROU
- Page 272 and 273: Gold Canyon Resources Inc: Final En
- Page 274 and 275: Gold Canyon Resources Inc: Final En
- Page 276 and 277: Gold Canyon Resources Inc: Final En
- Page 278 and 279: Gold Canyon Resources Inc: Final En
- Page 280 and 281: Gold Canyon Resources Inc: Final En
- Page 282 and 283: Gold Canyon Resources Inc: Final En
CROSSING 13 SPRINPOLE ROAD - SITE PICTURES TAKEN APRIL 2012<br />
GOLD CANYON RESOURCES<br />
STREAM SIMULATION CULVERT SIZE = 1000MM<br />
37