Table 2 - Water Crossing Hydrology Results, Springpole Road, East of Red Lake, <strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Crossing<br />

Number<br />

Drainage Area<br />

(km 2 )<br />

Lake Area<br />

(km 2 )<br />

Swamp Area<br />

(km 2 )<br />

Watershed<br />

Slope (m/m)<br />

Q25 (m 3 /s)<br />

Q25 Culvert<br />

Size (mm dia.)<br />

Recommended<br />

Structure<br />

1, Deaddog 14.7 *2.94 0.0 0.0031 3.3 1600 30’ bridge<br />

2 0.3 0.0 0.045 0.015 0.5 800 1200mm culvert<br />

3 0.91 0.0 0.067 0.01 1.1 1000 1400mm culvert<br />

4 0.5 0.0 0.037 0.008 0.7 800 1200mm culvert<br />

5 0.7 0.0 0.09 0.007 0.8 1000 1400mm culvert<br />

6 0.8 0.0 0.042 0.008 1.0 1000 1400mm culvert<br />

7, Birch 1366 273 Not significant 0.00044 58.2 Not applicable 120’ bridge<br />

**8, East end of<br />

Springpole Lake<br />

0.8 0.1 0.007 0.008 0.6 800 1200mm culvert<br />

9 1.5 0.1 0.3 0.0047 0.8 900 1400mm culvert<br />

10 0.7 0.1 0.0 0.005 0.5 800 1200mm culvert<br />

11 0.07 0.0 0.0 0.008 0.2 500 1000mm culvert<br />

12 0.05 0.0 0.0 0.008 0.1 500 1000mm culvert<br />

13 0.11 0.0 0.0 0.008 0.3 600 1000mm culvert<br />

**14, near camp 0.7 0.08 0.01 0.008 0.6 800 1200mm culvert<br />

Notes: * Actual lake area is greater, however it has been limited to 20% of watershed area as per MNR procedure<br />

** Crossing location is currently under review and may change<br />

Water Crossing <strong>Report</strong> Adamson Consulting Page 8 of 14<br />

Springpole Road October 21, 2012