06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DST Consulting Engineers Inc.<br />

106 North Cumberland Street, Suite 100<br />

Thunder Bay ON, P7A 4M2<br />

Tel: 807-345-3620<br />

Fax: 807-344-4738<br />

www.dstgroup.com<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

OBJECTIVIES:<br />

The objectives of the aerial survey were to:<br />

1. Survey a portion of the Regional <strong>Study</strong> Area which covered the main<br />

proposed area of development and the two proposed road corridors, to<br />

determine what areas were being utilized by caribou and/or moose, as<br />

well as any other large mammals, in the winter.<br />

2. GPS locations of observed stick nests.<br />

METHODS:<br />

General methods for aerial survey:<br />

January 14, 2013:<br />

Fly 30 km long transects (east/west) spaced at 1 km intervals<br />

Document all observed tracks, sign and animals<br />

Record the age and sex (where possible) of observed animals,<br />

Document all observed stick nests<br />

• Traveled to Forest Helicopters (Kenora)<br />

• Flew transects (5 and ½ transects completed)<br />

January 15, 2013:<br />

• Continued flying transects (12 additional transects completed).<br />

• Picked up trail camera located in the south eastern bay of Springpole<br />

January 16, 2013:<br />

• Picked up trail camera located behind camp<br />

Edmonton Winnipeg Kenora Thunder Bay Sudbury Waterloo Ottawa<br />

Kingston<br />

1.0.0.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!