06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Springpole <strong>Gold</strong> Project<br />

Road Alternatives Assessment<br />

from the current terminus of the Wenasaga road and extending northward to the Springpole<br />

camp. As per the guidance document, the mitigation of potential effects are discussed over<br />

multiple scales (ranges, seasonal ranges, high use areas, and calving sites) utilizing the<br />

following pre-determined assessment principles:<br />

1. Manage cumulative disturbance within the Range by minimizing the anthropogenic<br />

disturbance footprint<br />

The range assessment determined that the CCR already exceeds the “low risk” threshold of<br />

35% disturbance (Table 3.5.2). The construction of a road corridor will add to this measure of<br />

disturbance, however, the disturbance caused by either road option will have a negligible (i.e.<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!