06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Springpole <strong>Gold</strong> Access Corridor Project<br />

<strong>Final</strong> <strong>Environmental</strong> <strong>Study</strong> <strong>Report</strong><br />

1.0 INTRODUCTION<br />

GCU is a growing mineral exploration company that is focused on the Springpole Property<br />

(“Property”) area. The Property has a long exploration history and has been explored intermittently<br />

for gold since the 1920s. This historic exploration activity has resulted in the presence of exploration<br />

trenches (overburden stripped to bedrock) and a network of mineral exploration trails within the<br />

Property to provide access for linecutting, trenching, limited surface stripping and diamond drilling.<br />

GCU obtained the Property in 1998 and has explored the Property and expanded its land position<br />

since that time. Historic exploration activities are summarized in Photograph 1-1.<br />

Photograph 1-1: Summary of Historical Exploration Activity<br />

The identified zones at the Property are currently GCU’s primary asset. GCU released a resource<br />

estimate on the Property in February 2012, in accordance with National Instrument 43101<br />

guidelines, which outlined just under four (4) million ounces of gold and 16.5 million ounces of silver<br />

in the inferred category (includes 1.2 million ounces of gold and 4.8 million ounces of silver in the<br />

indicated category). Following the publication of the Draft ESR, GCU released an updated resource<br />

estimate in October 2012 in accordance with National Instrument 43101 guidelines. This updated<br />

resource outlined a 4.41 million ounces of gold and 23.8 million ounces of silver in the indicated<br />

category and an additional 0.69 million ounces of gold and 2.7 ounces of silver in the inferred<br />

category. The press release is available at http://goldcanyon.mwnewsroom.com/pressreleases/gold-canyon-updates-springpole-resource-tsx-venture-gcu-201210170826823001.<br />

As<br />

evidenced by this resource estimate, the 2012 drilling program was very successful at increasing the<br />

confidence in the Deposit by converting inferred ounces to indicated ounces and also increasing the<br />

overall size of the Deposit. Having defined a multi-million ounce resource that is expected to be<br />

expanded with further diamond drilling, the Springpole <strong>Gold</strong> Project is regarded as a highly<br />

prospective resource definition project rather than a preliminary, grassroots exploration project. A<br />

July 2013 Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!