06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Springpole <strong>Gold</strong> Access Corridor Project<br />

<strong>Final</strong> <strong>Environmental</strong> <strong>Study</strong> <strong>Report</strong><br />

SFL: Sustainable Forest License, used in reference to the Trout Lake SFL.<br />

SGR: Silvicultural ground rules, as defined in an approved Forest Management Plan.<br />

Springpole <strong>Gold</strong> Project: The on-going exploration and definition of the mineral resources at the<br />

Property, as described at http://www.goldcanyon.ca/s/Springpole_<strong>Gold</strong>.asp?<strong>Report</strong>ID=535882.<br />

The Springpole <strong>Gold</strong> Project includes the seasonal installation of an ice-road over Birch Lake until<br />

a land-based access corridor is established. Once a land-based access corridor is established,<br />

the seasonal ice road over Birch Lake will no longer be constructed. The assessment of<br />

alternative land-based access corridors is the subject of this ESR.<br />

TFTO: Trout Forest Tourism Operators<br />

UTM: Universal Transverse Mercator.<br />

VEC: Valued environmental component (biophysical or socio-cultural environmental components).<br />

Western corridor: The western corridor alternative shown on Figure 2-1.<br />

WFN: Wabauskang First Nation<br />

References<br />

Bridge, S., Watt, W.R., Lucking, G. and Naylor, B., (Bridge et al), 2000. Landscape Analysis<br />

for Forest Management Planning in Boreal Northeastern Ontario. OMNR Northeast<br />

Science and Technology Unit, 36 p.<br />

Cat Lake First Nation, Slate Falls Nation, and Ontario Ministry of Natural Resources (Cat Lake<br />

Fist Nation et al.), 2011: Cat Lake – Slate Falls Community Based Land Use Plan,<br />

“Niigaan Bimaadiziwin” – A Future Life.<br />

Department of Fisheries and Oceans (DFO), 1995. Freshwater Intake End-of Pipe Fish Screen<br />

Guideline<br />

DST Consulting Engineers Inc. (DST), 2013A. Biological Constraints <strong>Report</strong> for Springpole <strong>Gold</strong><br />

Access Corridor Project Alternatives Assessment. Prepared for <strong>Gold</strong> <strong>Canyon</strong> Resources<br />

Inc.<br />

Gustafson, E.J. and Crow, T.R., 1994. Modeling the effects of forest harvesting on landscape<br />

structure and the spatial distribution of cowbird parasitism. Landscape Ecology 9:<br />

237-<strong>24</strong>8.<br />

Gustafson, E.J. and Crow, T.R., 1996. Simulating the effects of alternative forest management<br />

Strategies on landscape structure. Journal of <strong>Environmental</strong> Management 46:77-94.<br />

July 2013<br />

Page ix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!