05.05.2015 Views

Vyavasaya Nadham July 2013 - KSSIA Kottayam

Vyavasaya Nadham July 2013 - KSSIA Kottayam

Vyavasaya Nadham July 2013 - KSSIA Kottayam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

............................................................................................................................................<br />

hyhkmb\mZw<br />

KERALA STATE ELECTRICITY BOARD<br />

Minutes of the District Level Grievance Committee Meeting<br />

held on 06.06.<strong>2013</strong> At Electrical Circle <strong>Kottayam</strong><br />

The meeting commenced at 12.00 pm after a silent<br />

prayer with Deputy Chief Engineer, Sri. G. Mohanantha<br />

Panicker in the chair. All the participants were warmly<br />

welcomes and self introduction was done by the<br />

participants. The minutes of previous meeting was<br />

reviewed.<br />

In his introductory speech, the Chair informed that<br />

the supply interruption caused during the previous<br />

month was due to the pre monsoon maintenance work<br />

at both the Transmission and Distribution wings and<br />

also due to natural calamities<br />

The Executive Engineer, Electrical Division, Vaikom<br />

informed that the AB switches were installed at<br />

Industrial Estate, Vaikom.<br />

The Chair informed that the Railway authorities<br />

convinced to provide facility to draw power cable<br />

through the railway over bridge at Kumaranalloor<br />

which is under construction so that the interruption<br />

at Kumaranelloor Industrial Estate will be reduced.<br />

The Executive Engineer, Electrical Division, Vaikom<br />

informed that at the time of Railway doubling works<br />

the existing cable will be replaced along with drawing<br />

of new cable.<br />

The Chair enquired about he status of proposal of<br />

installation of new 110/11kV transformer at<br />

Poovanthirithu substation meant for feeding the<br />

Industrial Estate. The representative of the KSSI,<br />

<strong>Kottayam</strong> informed that the file is moved upto the<br />

Finance Department for approval.<br />

The Chair informed that the TOD meterng will be<br />

implemented only from 01.09.<strong>2013</strong> onwards.<br />

The Chair seeks about the rectification of faults at<br />

the DP structure near Malayala Manorama. The<br />

Executive Engineer, Electrical Division, Pallom inforned<br />

that the maintenance was done on the structure and<br />

the AB had not replaced due to its shortage. The<br />

representatived suggested for carrying out the<br />

maintenance work on Sundays. The Executive<br />

Engineer, Electrical Division, Pallom informed that the<br />

other consumers except Industrial consumers are not<br />

entertained by the suggestion since being a holiday<br />

electric supply is essential for them.<br />

The representative of Mini Industrial Estate, T.V.<br />

Puram stated that the voltage fluctuation is more in<br />

T.V. Puram and the KSE Board staff did not intimate<br />

the date of maintenance works. He also suggested for<br />

carrying out the scheduled works on Mondays after<br />

prior intimation to them. The intermittent supply<br />

interruption causes much loss to both the firm and<br />

KSE Board. The Chair directed the Executive Engineers<br />

to intimate the Assistant Engineers under their<br />

jurisdiction to carry out the maintenace wrok of<br />

Industrial Estate on first Monday of each month after<br />

prior intimation to the representatives of the SSI unit<br />

at that area. Also the maintenance work of the 11kV<br />

feeders to the Industrial Estate shall be done on the<br />

same day so as minimize the interruption.<br />

The representative of the Industrial Estate T.V. Puram<br />

complained against the frequent supply interruption<br />

due to other service connections from the transformer<br />

installed under minimum guarantee scheme. The<br />

Executive Engineer Electrical Division, Vaikom informed<br />

that necessary action for reducing the supply<br />

interruption tot he extent possible will be taken.<br />

The representatives complained against the supply<br />

interruption. The chair informed that in rural areas the<br />

lines passes through plantation and in rainy season<br />

the tree trunks fall over the lines and causes<br />

interruption..<br />

The representatives of Mini Industrial Estate T.V.<br />

Puram enquired about the feasibility of new feeder.<br />

The chair informed that it is possible if the cost for<br />

realization of the same is afforded by the firm. Tje<br />

re[resentative also informed that the news regarding<br />

the interruption got from the news papers were not<br />

correct. The Executive Engineer, Electrical Division,<br />

Pallom informed that it is because of the back feeding<br />

of the feeders up to the area where the maintenance<br />

is carried out. This will avoid unnecessary interruption<br />

to the other consumers. The Chair explained about<br />

the revised tariff and re-categorization of the tariff with<br />

effect from 01.05.213<br />

The meeting came to close at 1.30PM<br />

8 THE HOME JOURNAL OF KERALA STATE SMALL INDUSTRIES ASSOCIATION, KOTTAYAM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!