was slightly improved but the ventage at the sluice was too inadequate. Subsequently a scheme was<br />
originally framed to drain a total area of 33.15 sq.km. (12.80 sq.mls.) of which 22.53 sq.km. area is<br />
urban <strong>and</strong> 10.62 sq.km. being rural. Drainage indices @ 75 mm per day for urban <strong>and</strong> 20 mm for<br />
rural area were adopted. The area is located on the east of the Budge Budge Rly. line <strong>and</strong> Tolly's<br />
Nullah, Salt Lake Basin on the west, on the south of SWF channel <strong>and</strong> on the north of Tolly's Nullah.<br />
The scheme was executed in 1972. It is one of the largest drainage arteries of the Kolkata<br />
Metropolitan area. Apart from domestic discharges, it carries industrial wastes, decaying materials<br />
<strong>and</strong> carcasses. Lots of unauthorised shanty dwellers residing on its banks also use it for their<br />
sanitary purposes <strong>and</strong> disposal of solid wastes. The area is very much prone to water logging having<br />
some low lying pockets.<br />
T.P. Basin Drainage Scheme was designed to drain the additional urban run-off by excavating<br />
another new lower level drainage channel named as "Intercepting Channel" connecting the Branch<br />
Channels BB1, CC1, DD1, EE1, segregating the urban area from rural area <strong>and</strong> the urban run-off<br />
would find its way through these channels to the Intercepting channel <strong>and</strong> the old TP Main Canal with<br />
its outfall pumping station would cater for the rural run-off <strong>and</strong> some of the urban run-offs through<br />
the other branch channels, viz. A1-A2, A3-A4, A5-A6 It was imperative to provide for pumping for<br />
disposal of the additional discharge from the basin <strong>and</strong> accordingly, the new pumping station,<br />
known as Chowbhaga New Pumping Station was constructed near the old one with 10 nos. of pumps<br />
of 50 cusecs each making a total of 500 cusecs ( 14.16 cumecs ).<br />
Originally, there were 9 nos. of Pumps of capacity 50 cusecs each at Chowbhaga being constructed<br />
during the year 1966-67. Afterwards, the basin condition changed, additional basin area was<br />
included, thereby increasing the area to 47.40 sq. km. (18.30 sq.mls.). A scheme for installation of<br />
additional pumps was drawn up to drain out the extra water due to urbanisation <strong>and</strong> inclusion of more<br />
rural areas. The capacity of new additional pump house was so designed that this pump house along<br />
with the existing ones may cater a limited discharge of 41 cumecs (1450 cusecs) to the SWF<br />
channel. As such, 1 5 nos. of pumps in total of capacity 50 cusecs each were installed.<br />
The drainage of the South-Suburban <strong>and</strong> the Garden Reach areas falling within Kolkata Municipal<br />
Corporation Ward nos. 115 to 132 <strong>and</strong> 133 to 141 areas is catered through Monikhali, Churial<br />
Keorapukur Khals, a brief outline of which is discussed in the following paragraphs.<br />
Monikhali Khal<br />
Monikhali Basin, with an area of 54.00 sq. km. consists of two main drainage arteries (1) New<br />
Monikhali Khal <strong>and</strong> (2) Old Monikhali Khal, the lengths being 6.931 Km. <strong>and</strong> 4.998 Kms.