alleviating drainage congestion. The reasons for drainage problems of this system may be<br />

summarized as follows:<br />

• Drainage lockage while High Tide <strong>and</strong> rising of low water level due to rise of river<br />

bed governing the outfall efficiency in an adverse way.<br />

• The old channel section has nearly remained unchanged n spite of big changes<br />

in drainage load.<br />

• Increase of population density resulting in additional loads.<br />

• Huge change in l<strong>and</strong>-use-pattern<br />

• Drastic reduction in spill areas.<br />

The drainage discharge mainly of the following Boroughs is being served by the SWF channel at<br />

present. Part of Borough IV, Part of Borough V, Part of Borough VI, Part of Borough VII, Part of<br />

Borough VIII, Part of Borough X, Part of Borough XI <strong>and</strong> Borough XII. During heavy rainfall,<br />

substantial area under the above Boroughs gets waterlogged <strong>and</strong> duration of inundation lasts for a<br />

long period due to inadequate capacity of the existing drainage system outfalling in SWF channel.<br />

To overcome the severe drainage problem, KEIP has taken up sewage <strong>and</strong> drainage project mainly<br />

for the added areas of Kolkata to address the drainage inadequacies of the area- specially falling<br />

under Borough VII, XI, <strong>and</strong> XII by construction of new pumping stations <strong>and</strong> also by augmentation of<br />

the existing pumping stations. This will result in additional discharge in SWF channel.The 3rd<br />

additional pump house at Chowbhaga <strong>and</strong> the new pumping station at Borough VII will increase the<br />

present drainage load of SWF channel at Chowbhaga point by 25.51 + 70% of 13.00 (since the<br />

discharge of the ail the pumping stations will not synchronize at the same time) = 34.61 m3/sec. The<br />

resulting afflux will surely affect the Full Drainage Level of the upstream channel, too. The Full<br />

Drainage Level (FDL) of crucial Topsia point 'A' will thus be increased from the already strained<br />

inconvenient level during tidal lockage. Due to increase in FDL, more areas will be waterlogged for<br />

longer duration.<br />

The design discharge of SWF channel before reaching additional pump house complex of<br />

Chowbhaga is 46.44 m3/sec. <strong>and</strong> the proposed pumped discharge from Borough VII is about 9.1<br />

m3/sec. The total discharge comes to about 46.44 + 9.1 = 55.54 m3/sec. The peak discharge<br />

capacity of SWF channel required before reaching the proposed 3rd additional pump house outfall at<br />

Chowbhaga is 55.54 + 8.45 + 11.34 + 11.34+ 25.51 m3/sec. = 112.18 m3/sec. (the capacity of the<br />

Old Pump House, if. Additional P.S., 2nd. Additional P.H <strong>and</strong> proposed 3rd.Additional P.M. are 8.45<br />

+ 11.34 + 11.34+ 25.51 m3/sec respectively). The objective of setting up the proposed dumping<br />

stations is to provide relief to its catchment area from water-logging upto the design year 2035. This