Outlet arrangement:<br />
Outlet arrangement consists of excavation of outfall channel with construction of energy<br />
dissipating structures with side retaining wail, meeting with the outfall channel.<br />
Power supply arrangement:<br />
Provision for necessary power supply with substation facilities has been considered.<br />
Ancillary facilities<br />
(i) Internal roads (ii) Water supply (iii) Fire fighting equipment (iv) Exhaust fans <strong>and</strong> other<br />
accessories as required for ventilation purpose & (v) Bridge over outlet channel.<br />
Cost for the proposed pump house is estimated at about Rs. 18.00 Crores, the details of which are<br />
provided in the following table.<br />
A. Mechanical & Electrical Works<br />
Sl. No. Item Unit Quantity Rate in Rs. Amount in Rs.<br />
1 Pumps & Motors 4.25 cumec Set 6 4,750,000.00 28,500,000<br />
2 Pumps & Motors 1.42 cumec Set 4 2,820,000.00 11,280,000<br />
3 Pipes & Fiap Valves No. 10 800,000.00 8,000,000<br />
4 Stop Log Gates, Bar Screen &<br />
L.S. 4,000,000<br />
5<br />
Trash Rack<br />
Gantry Crane Set 1 5,000,000.00 5,000,000<br />
6<br />
Transformer 1 1/6 KV 2.5 MVA (Dry<br />
Set<br />
type)<br />
2 2,500,000.00 5,000,000<br />
7 VCB &VCP Panels L.S. 4,500,000<br />
8 VCB Panel (For S/S) L.S. 3,00,000<br />
9<br />
1000 KVA Transformer (Station<br />
service) Set 1 2,000,000.00 2,000,000<br />
10 Capacitors L.S. 700,000<br />
11 HT Cable / LT Cable / Con. Cable L.S. 4,000,000<br />
12 Incoming Feeder (HT)<br />
L.S.<br />
Included in Item<br />
No. 11<br />
13 Earthing L.S. 186,000<br />
14 Illumination L.S. 1,000,000