03.05.2015 Views

Cyclone and Storm Surge - Iczmpwb.org

Cyclone and Storm Surge - Iczmpwb.org

Cyclone and Storm Surge - Iczmpwb.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.52<br />

Khejuri-II 0.931 Very High 235 51 10 Nil 3<br />

Ramnagar-I 0.992 Very High Nil 82 6 4 1<br />

Ramnagar-II 0.931 Very High 75 74 29 5 Nil<br />

Contai-I 0.975 Very High Nil 146 46 1 Nil<br />

Contai-II 0.950 Very High 175 117 22 Nil 3<br />

Kultali 0.965 Very High 318.25 7 14 20 13<br />

Basanti 0.989 Very High 185.8 18 18 18 6<br />

Gosaba 0.987 Very High 266 12 9 29 6<br />

Namkhana 0.969 Very High 308 8 6 Nil 5<br />

Sagar 0.900 Very High 528.43 12 9 4 8<br />

In this study, improvement of the mobility has focused has three key aspects as represented<br />

following.<br />

1. Capacity augmentation <strong>and</strong> surface quality improvement of existing road links<br />

This is done by upgrading the existing unsurfaced roads to Single lane WBM (Water Bound<br />

Macadam) roads.<br />

Total Expenditure: Rs. 167.3 Crores approximately [Conversion of 4227 kms Unsurfaced<br />

road to WBM roads @ Rs. 0.8 million/km]<br />

2. Identification of missing links<br />

A detailed look into the village level connectivity indicates that some of the villages are yet to<br />

have direct access through surfaced roads. Apart from these, culverts, bridges at key

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!