Cyclone and Storm Surge - Iczmpwb.org
Cyclone and Storm Surge - Iczmpwb.org
Cyclone and Storm Surge - Iczmpwb.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.10<br />
Recurrence interval (in years)<br />
10 25 50 100 200<br />
Maximum wind speed (knots) 90 105 116 125 135<br />
<strong>Storm</strong> surge height (m) 4.5 6.3 7.8 9.2 10.9<br />
A reasonable recurrence interval for assessing the crest of embankments facing the sea may be<br />
considered as 50 years. Thus, adding a freeboard, one may say that an embankment crest elevation<br />
of 8m above Mean Sea Level may be thought of as safely withst<strong>and</strong>ing the overtopping of surges<br />
that is likely to occur with a recurrence of 50 years.<br />
As for the embankments along the rivers, channels <strong>and</strong> creeks, the rise of the water levels as a<br />
consequence of a rise of the sea water level due to cyclonic storm surges has to be decided upon<br />
the river hydrodynamics. Considering a rise of 7.8m of the sea (with a recurrence interval of 50<br />
years) causes rise of water levels that is much less as the dynamic nature of the surge is dampened<br />
as it enters the channels <strong>and</strong> creeks.<br />
From the note of Superintending Engineer, eastern Circle, I&W Department, Government of West<br />
Bengal that was prepared in December 2005, titled “Scheme for the revetment works of the<br />
Embankments of Sundarban Areas in the districts of North & South 24-Parganas”, it is necessary to<br />
provide immediate revetment protection to about 235 kms critical length of embankments in the<br />
Sundarbans out of a total of about 3500 kms. The regions that require immediate attention include:<br />
(a) Sea facing dyke – 17 km, (b) Embankments facing major rivers – 139 km, <strong>and</strong> (c) Embankments<br />
facing medium rivers – 79 km. It is estimated that the total cost estimate is around Rs. 467.82<br />
Crores. Further, 91 km length out of 225 km length of embankments already protected with<br />
revetment under the scheme “Urgent Development Works of Sundarban” need a thorough<br />
maintenance, which requires a sum of Rs.72.18 Crore. Thus, a total sum of Rs.540.00 Crore is<br />
required in the first phase for protection of the most critical of the Sundarban embankments. The<br />
technical <strong>and</strong> financial details of the proposal are presented below.<br />
Embankment design<br />
(a) Major rivers to armour the riverside slopes (3:1 to 4:1) of the embankments by providing 32.5<br />
cm thick dry brick pitching / 25 cm thick brick block pitching over a layer of 12.5 cm to 15 cm thick<br />
jhama khoa filter with provision of a brick sausage toe wall.