complete.(Payment to be made on basis of measurement of<br />
finished quantity of work).<br />
a With earth obtained from excavation of foundation. %Cum 3.19<br />
b With carried earth arranged by contractor <strong>with</strong>in a radius of %Cum 0.25<br />
3km including cost of carried earth<br />
3(a) Anti termite treatment to the top surface of the consolidated<br />
earth <strong>with</strong>in plinth walls <strong>with</strong> chemical emulsion by<br />
admixing chloropyrofos emulsifiable concentrates ( 1%<br />
concentration) <strong>with</strong> water by weight at the rate of 5 Litres<br />
per Sq.M of the surface be<strong>for</strong>e sand bed or sub-grade is<br />
laid. Holes upto 50 mm. to 75 mm. deep at 150 mm. centre<br />
to centre both ways shall be made <strong>with</strong> 12 mm, diameter<br />
mild steel rod on the surface to facilitate saturation of the<br />
soil <strong>with</strong> the chemical emulsion. The work shall be carried<br />
out as per specification described in para 6.4 of code IS-<br />
6313 (part -II) 1981. (Mode of measurement will be per<br />
Sq.M of plan area of plinth treated.)<br />
Sqm 58.65<br />
3(b)<br />
Pre-constructional ant termite measures<br />
Treatment to the back filling of RCC foundation <strong>with</strong><br />
chemical emulsion by admixing Chloropyrofos emulsifiable<br />
concentrate (1% concentration) <strong>with</strong> water by weight @ 7.5<br />
liters per sqm of the vertical surface of the substructure of<br />
each side of the foundation. The work shall be carried out as<br />
per specification as described in para 6.3.1 of code IS-6313<br />
(part-II) 1981 (Mode of measurement will be per sq.m. of<br />
vertical area of foundation treated).<br />
Sqm<br />
203.00<br />
4 Filling in foundation or plinth by silver sand in layers not<br />
exceeding 150mm by thorough saturation <strong>with</strong> water,<br />
ramming complete exceeding 150 mm as directed and<br />
consolidating the same including the cost of supply of sand.<br />
(Payment to be made on measurement of finished quantity)<br />
%Cum. 0.86<br />
B. CEMENT CONCRETE WORK<br />
1 Ordinary cement concrete (mix 1:2:4) <strong>with</strong> graded stone<br />
chips (20mm nominal size) excluding shuttering and<br />
rein<strong>for</strong>cement, if any, in ground floor as per relevant IS<br />
code<br />
(a) Pakur variety Cum 40.75<br />
2 Controlled Cement concrete <strong>with</strong> well graded stone chips<br />
(20 mm nominal size ) excluding shuttering and<br />
rein<strong>for</strong>cement <strong>with</strong> complete design of concrete as per IS :<br />
456 and relevant special publications submission of job mix<br />
<strong>for</strong>mula after preliminary mix design after testing of<br />
concrete cubes as per direction of Engineer-in charge<br />
Consumption of cement will not be less than 300 Kg of<br />
cement <strong>with</strong> Super plasticiser per cubic meter of controlled<br />
concrete but actual consumption will be determined on the<br />
basis of preliminary test and job mix <strong>for</strong>mula. In ground<br />
floor and foundation.<br />
(i) Pakur Variety<br />
[using concrete mixture]<br />
M 25 Grade<br />
upto plinth Cum 120.37<br />
Ground Floor Cum 69.29<br />
1st Floor Cum 53.25<br />
99