complete.(Payment to be made on basis of measurement of<br />

finished quantity of work).<br />

a With earth obtained from excavation of foundation. %Cum 3.19<br />

b With carried earth arranged by contractor <strong>with</strong>in a radius of %Cum 0.25<br />

3km including cost of carried earth<br />

3(a) Anti termite treatment to the top surface of the consolidated<br />

earth <strong>with</strong>in plinth walls <strong>with</strong> chemical emulsion by<br />

admixing chloropyrofos emulsifiable concentrates ( 1%<br />

concentration) <strong>with</strong> water by weight at the rate of 5 Litres<br />

per Sq.M of the surface be<strong>for</strong>e sand bed or sub-grade is<br />

laid. Holes upto 50 mm. to 75 mm. deep at 150 mm. centre<br />

to centre both ways shall be made <strong>with</strong> 12 mm, diameter<br />

mild steel rod on the surface to facilitate saturation of the<br />

soil <strong>with</strong> the chemical emulsion. The work shall be carried<br />

out as per specification described in para 6.4 of code IS-<br />

6313 (part -II) 1981. (Mode of measurement will be per<br />

Sq.M of plan area of plinth treated.)<br />

Sqm 58.65<br />

3(b)<br />

Pre-constructional ant termite measures<br />

Treatment to the back filling of RCC foundation <strong>with</strong><br />

chemical emulsion by admixing Chloropyrofos emulsifiable<br />

concentrate (1% concentration) <strong>with</strong> water by weight @ 7.5<br />

liters per sqm of the vertical surface of the substructure of<br />

each side of the foundation. The work shall be carried out as<br />

per specification as described in para 6.3.1 of code IS-6313<br />

(part-II) 1981 (Mode of measurement will be per sq.m. of<br />

vertical area of foundation treated).<br />

Sqm<br />

203.00<br />

4 Filling in foundation or plinth by silver sand in layers not<br />

exceeding 150mm by thorough saturation <strong>with</strong> water,<br />

ramming complete exceeding 150 mm as directed and<br />

consolidating the same including the cost of supply of sand.<br />

(Payment to be made on measurement of finished quantity)<br />

%Cum. 0.86<br />

B. CEMENT CONCRETE WORK<br />

1 Ordinary cement concrete (mix 1:2:4) <strong>with</strong> graded stone<br />

chips (20mm nominal size) excluding shuttering and<br />

rein<strong>for</strong>cement, if any, in ground floor as per relevant IS<br />

code<br />

(a) Pakur variety Cum 40.75<br />

2 Controlled Cement concrete <strong>with</strong> well graded stone chips<br />

(20 mm nominal size ) excluding shuttering and<br />

rein<strong>for</strong>cement <strong>with</strong> complete design of concrete as per IS :<br />

456 and relevant special publications submission of job mix<br />

<strong>for</strong>mula after preliminary mix design after testing of<br />

concrete cubes as per direction of Engineer-in charge<br />

Consumption of cement will not be less than 300 Kg of<br />

cement <strong>with</strong> Super plasticiser per cubic meter of controlled<br />

concrete but actual consumption will be determined on the<br />

basis of preliminary test and job mix <strong>for</strong>mula. In ground<br />

floor and foundation.<br />

(i) Pakur Variety<br />

[using concrete mixture]<br />

M 25 Grade<br />

upto plinth Cum 120.37<br />

Ground Floor Cum 69.29<br />

1st Floor Cum 53.25<br />

99