BID Document for Guest House with Boundary Wall.pdf - Integrated ...
BID Document for Guest House with Boundary Wall.pdf - Integrated ... BID Document for Guest House with Boundary Wall.pdf - Integrated ...
The Works consist of—Construction of building, laying of sewer line, civil, mechanical and electrical job, Landscaping, horticulture, etc [brief summary, including relationship to other contracts under the Project]. The Start Date shall be the date of issue of notice to proceed with the work. (1.1) The Intended Completion Date for the whole of the Works is 12 month with the following milestones: [17, 28] Milestone dates: Physical works to be completed Period from the date of issue of notice to proceed with the work . Milestone 1 i.e. Completion of all civil work for guest house and office building 7 (seven) months Milestone 2 i.e Completion of all sanitary and plumbing, electrical work, with external work i.e storm water drain, water distribution system, sewerage disposal, under ground reservoir 10 (Ten) months. . Milestone 3 i.e. Completion of all remaining works including boundary wall 12 (twelve) months The following documents also form part of the Contract: [2.3] _____________NIL________________________ The Contractor shall submit a revised program including Environmental Management Plan for the Works (in such form and detail as the engineer shall reasonably prescribe) within 14 days of delivery of the Letter of Acceptance. [27] The Site Possession Dates shall be: fourteen days from the date of signing the agreement [21] The Site is located at Digha, Dist-East Midnapur, West Bengal_____________________________________ and is defined in drawings nos. a) of section 6______________________________ ______________________________ ________________________________________________________ The Defects Liability Period is _365 days from the date of certification of completion of works. (where sectional completion certificate is issued this will apply from those dates for those sections). [35] Insurance requirements are as under: [13] (i) Works and Plant and Materials Minimum Cover for Insurance Contract value Maximum deductible for Insurance 5% of the Contract Value (ii) Loss or damage to Total book value of 5% of the figure Equipment the equipment alongside brought to the site by the contractor (iii) Other Property Rs.10,00,000/- Rs.10,000/- 60
(iv) Personal injury or death insurance: a) for other people; As per Workmen’s Compensation Act 1923 and other Acts in force. As per Workmen’s Compensation Act 1923 and other Acts in force. b) for Contractor’s Employees In accordance with the statutory requirements applicable to India, Workmen Compensation Act. The following events shall also be Compensation Events: [44] 1. _____________________NIL_______________________________ 2. _____________________NIL_______________________________ 3. _____________________NIL_______________________________ 4. _____________________NIL_______________________________ The period between program updates shall be 30 days. [27] The amount to be withheld for late submission of an updated program shall be Rs 2,00,000.00 ____________________________________________[27] The language of the Contract documents is English [3] The law which applies to the Contract is the laws of Union of India [3] The currency of the Contract is Indian Rupees. [46] Fees and types of reimbursable expenses to be paid to the Adjudicator [25] Rs.3000.00 per sitting plus reimbursable expenses, (i.e.) Traveling, boarding & lodging expenses _____________________________________________________________________ _____________________________________________________________________ Appointing Authority for the Adjudicator The President, Institution of Engineers (India), Kolkata chapter [26] The formula(e) for adjustment of prices are Deleted The proportion of payments retained (retention money) shall be 6% from each bill subject to a maximum of 5% of final contract price [48] The liquidated damages for the whole of the works are (0.05%) per day and that for the milestone are as under : [49] For milestone 1 For milestone 2 For milestone 3 Rs 7000.00 per day Rs 3500.00 per day Rs 8500.00 per day The maximum amount of liquidated damages for the whole of the works [49] is ten percent of final contract price. The amounts of the advance payment are: [51] 61
- Page 9 and 10: (d) (e) The contractor or his ident
- Page 11 and 12: B. Bidding Documents 8. Content of
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.2 In evaluating the Bids, the Em
- Page 19 and 20: (ii) (iii) “fraudulent practice
- Page 21 and 22: Contractor's Bid Construction of Gu
- Page 23 and 24: Qualification Information The infor
- Page 25 and 26: 1.6 Qualifications and experience o
- Page 27 and 28: Integrated Coastal Zone Management
- Page 29 and 30: 2 To be used only if the Contractor
- Page 31 and 32: Agreement Form Agreement This agree
- Page 33 and 34: SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36: Conditions of Contract A. General 1
- Page 37 and 38: (5) Conditions of Contract includin
- Page 39 and 40: 16. Contractor to Construct the Wor
- Page 41 and 42: 28.1 The Engineer-in-charge shall e
- Page 43 and 44: timing of the work in the Variation
- Page 45 and 46: 47. Price Adjustment 47.1 Contract
- Page 47 and 48: the Engineer-in-charge shall issue
- Page 49 and 50: (i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52: d) Maternity Benefit Act 1951: The
- Page 53 and 54: 3. Assignment of the contract may b
- Page 55 and 56: S. No. Activity 3. Consultation and
- Page 57 and 58: S. No. Activity Measures to be Impl
- Page 59: Contract Data Items marked "N/A" do
- Page 63 and 64: The advance shall be repaid from ea
- Page 65 and 66: GENERAL SPECIFICATIONS 1.0 SCOPE OF
- Page 67 and 68: S. No. IS No. DESCRIPTION 1 IS-1200
- Page 69 and 70: 82 IS:2963 83 IS:3004 84 IS:3311 Wa
- Page 71 and 72: Bricks shall be of first class qual
- Page 73 and 74: e moved around the top edge of the
- Page 75 and 76: 8.9 Bar Bending Schedule: Concrete
- Page 77 and 78: 9.3 Protections And Curing The cont
- Page 79 and 80: DETAILED TECHNICAL SPECIFICATION FO
- Page 81 and 82: 6.0 SHORING WORKS 6.1 General: Shor
- Page 83 and 84: When testing a pipeline hydraulical
- Page 85 and 86: (i) (ii) (iii) procurement & supply
- Page 87 and 88: the worst weather and flooding cond
- Page 89 and 90: All valves shall be provided with c
- Page 91 and 92: SECTION 6: Layout Drawings of the w
- Page 93 and 94: SCHEDULE OF QUANTITIES FOR GUEST HO
- Page 95 and 96: 2 Brick work with 1st class bricks
- Page 97 and 98: smooth finish acrylic exterior emul
- Page 99 and 100: complete.(Payment to be made on bas
- Page 101 and 102: approved brand (size not less than
- Page 103 and 104: and including smoothening surface b
- Page 105 and 106: 8.1 5/6 amps switch Each 30 8.2 15/
- Page 107 and 108: sets of G.I. nut bolt & spring wash
- Page 109 and 110: power unit having suitable rating S
The Works consist of—Construction of building, laying of sewer line, civil, mechanical and electrical job,<br />
Landscaping, horticulture, etc<br />
[brief summary, including relationship to other contracts under the Project].<br />
The Start Date shall be the date of issue of notice to proceed <strong>with</strong> the work. (1.1)<br />
The Intended Completion Date <strong>for</strong> the whole<br />
of the Works is 12 month <strong>with</strong> the following milestones: [17, 28]<br />
Milestone dates:<br />
Physical works to be completed<br />
Period from the date of issue of<br />
notice to proceed <strong>with</strong> the work<br />
.<br />
Milestone 1 i.e. Completion of all civil work <strong>for</strong> guest house and office building 7 (seven) months<br />
Milestone 2 i.e Completion of all sanitary and plumbing, electrical work, <strong>with</strong><br />
external work i.e storm water drain, water distribution system,<br />
sewerage disposal, under ground reservoir 10 (Ten) months.<br />
.<br />
Milestone 3 i.e. Completion of all remaining works including boundary wall<br />
12 (twelve) months<br />
The following documents also <strong>for</strong>m part of the Contract: [2.3]<br />
_____________NIL________________________<br />
The Contractor shall submit a revised program including Environmental<br />
Management Plan <strong>for</strong> the Works (in such <strong>for</strong>m and detail as the<br />
engineer shall reasonably prescribe) <strong>with</strong>in 14 days of<br />
delivery of the Letter of Acceptance. [27]<br />
The Site Possession Dates shall be: fourteen days<br />
from the date of signing the agreement [21]<br />
The Site is located at Digha, Dist-East Midnapur, West Bengal_____________________________________<br />
and is defined in drawings nos. a) of section 6______________________________<br />
______________________________<br />
________________________________________________________<br />
The Defects Liability Period is _365 days from the date of certification of completion of works. (where sectional<br />
completion certificate is issued this will apply from those dates <strong>for</strong> those sections). [35]<br />
Insurance requirements are as under: [13]<br />
(i)<br />
Works and Plant and<br />
Materials<br />
Minimum Cover<br />
<strong>for</strong> Insurance<br />
Contract value<br />
Maximum deductible<br />
<strong>for</strong> Insurance<br />
5% of the Contract<br />
Value<br />
(ii) Loss or damage to<br />
Total book value of 5% of the figure<br />
Equipment<br />
the equipment alongside<br />
brought to the site<br />
by the contractor<br />
(iii) Other Property Rs.10,00,000/- Rs.10,000/-<br />
60