BID Document for Guest House with Boundary Wall.pdf - Integrated ...
BID Document for Guest House with Boundary Wall.pdf - Integrated ... BID Document for Guest House with Boundary Wall.pdf - Integrated ...
SECTION 4: CONTRACT DATA 58
Contract Data Items marked "N/A" do not apply in this Contract. The following documents are also part of the Contract: Clause Reference · The Schedule of Operating and Maintenance Manuals [58] · The Schedule of Key Personnel [9] · The Methodology and program of Construction & Environmental Management Plan [27] · The Schedule of Key and Critical equipment to be deployed [27] on the work as per agreed program of construction · Site Investigation reports [14 The Borrower is Government of India and West Bengal is a participating state in the Integrated Coastal Zone Management project The World Bank means International Development Association [1.1] and credit refers to an IDA Credit ____________________________ The Employer is Name: The Project Director, Address: State Project Management Unit, Integrated Coastal Zone Management Project, Institute of Environmental Studies & Wetland Management, DD-24, Sector 1, Salt Lake City, Kolkata, India (1.1) Name of authorized Representative: : Subrat Mukherjee, Project Director SPMU, ICZMP, IESWM. __________________________ The Engineer is (1.1) Name: Sri Satyajit Pan, Address: Executive Engineer, PHED, Tamluk, Purba Midnapur,WB Name of Authorized Representative: Sri Subir Ghosh, Assistant Engineer, P.H.E Directorate, Digha The Adjudicator appointed jointly by the Employer and Contractor is: *Name : _____________________________________ (1.1) *Address : ______________________________________________________________________ (*to be filled in after the Adjudicator has been appointed) The name and identification number of the Contract is Construction of Guest House, Office Building & Allied Works At Digha, West Bengal Bid No.: 03-SPMU/WB/W-22/2013-14 59
- Page 7 and 8: A. General 1. Scope of Bid 1.1 The
- Page 9 and 10: (d) (e) The contractor or his ident
- Page 11 and 12: B. Bidding Documents 8. Content of
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.2 In evaluating the Bids, the Em
- Page 19 and 20: (ii) (iii) “fraudulent practice
- Page 21 and 22: Contractor's Bid Construction of Gu
- Page 23 and 24: Qualification Information The infor
- Page 25 and 26: 1.6 Qualifications and experience o
- Page 27 and 28: Integrated Coastal Zone Management
- Page 29 and 30: 2 To be used only if the Contractor
- Page 31 and 32: Agreement Form Agreement This agree
- Page 33 and 34: SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36: Conditions of Contract A. General 1
- Page 37 and 38: (5) Conditions of Contract includin
- Page 39 and 40: 16. Contractor to Construct the Wor
- Page 41 and 42: 28.1 The Engineer-in-charge shall e
- Page 43 and 44: timing of the work in the Variation
- Page 45 and 46: 47. Price Adjustment 47.1 Contract
- Page 47 and 48: the Engineer-in-charge shall issue
- Page 49 and 50: (i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52: d) Maternity Benefit Act 1951: The
- Page 53 and 54: 3. Assignment of the contract may b
- Page 55 and 56: S. No. Activity 3. Consultation and
- Page 57: S. No. Activity Measures to be Impl
- Page 61 and 62: (iv) Personal injury or death insur
- Page 63 and 64: The advance shall be repaid from ea
- Page 65 and 66: GENERAL SPECIFICATIONS 1.0 SCOPE OF
- Page 67 and 68: S. No. IS No. DESCRIPTION 1 IS-1200
- Page 69 and 70: 82 IS:2963 83 IS:3004 84 IS:3311 Wa
- Page 71 and 72: Bricks shall be of first class qual
- Page 73 and 74: e moved around the top edge of the
- Page 75 and 76: 8.9 Bar Bending Schedule: Concrete
- Page 77 and 78: 9.3 Protections And Curing The cont
- Page 79 and 80: DETAILED TECHNICAL SPECIFICATION FO
- Page 81 and 82: 6.0 SHORING WORKS 6.1 General: Shor
- Page 83 and 84: When testing a pipeline hydraulical
- Page 85 and 86: (i) (ii) (iii) procurement & supply
- Page 87 and 88: the worst weather and flooding cond
- Page 89 and 90: All valves shall be provided with c
- Page 91 and 92: SECTION 6: Layout Drawings of the w
- Page 93 and 94: SCHEDULE OF QUANTITIES FOR GUEST HO
- Page 95 and 96: 2 Brick work with 1st class bricks
- Page 97 and 98: smooth finish acrylic exterior emul
- Page 99 and 100: complete.(Payment to be made on bas
- Page 101 and 102: approved brand (size not less than
- Page 103 and 104: and including smoothening surface b
- Page 105 and 106: 8.1 5/6 amps switch Each 30 8.2 15/
- Page 107 and 108: sets of G.I. nut bolt & spring wash
Contract Data<br />
Items marked "N/A" do not apply in this Contract.<br />
The following documents are also part of the Contract:<br />
Clause Reference<br />
· The Schedule of Operating and Maintenance Manuals [58]<br />
· The Schedule of Key Personnel [9]<br />
· The Methodology and program of Construction & Environmental Management Plan [27]<br />
· The Schedule of Key and Critical equipment to be deployed [27]<br />
on the work as per agreed program of construction<br />
· Site Investigation reports [14<br />
The Borrower is Government of India and West Bengal is a participating state in the <strong>Integrated</strong> Coastal Zone Management<br />
project<br />
The World Bank means International Development Association [1.1]<br />
and credit refers to an IDA Credit<br />
____________________________<br />
The Employer is<br />
Name: The Project Director,<br />
Address: State Project Management Unit, <strong>Integrated</strong> Coastal Zone Management Project,<br />
Institute of Environmental Studies & Wetland Management, DD-24, Sector 1, Salt Lake City, Kolkata, India (1.1)<br />
Name of authorized Representative: : Subrat Mukherjee, Project Director SPMU, ICZMP, IESWM.<br />
__________________________<br />
The Engineer is (1.1)<br />
Name: Sri Satyajit Pan,<br />
Address: Executive Engineer, PHED, Tamluk,<br />
Purba Midnapur,WB<br />
Name of Authorized Representative: Sri Subir Ghosh, Assistant Engineer, P.H.E Directorate, Digha<br />
The Adjudicator appointed jointly by the Employer and Contractor is:<br />
*Name : _____________________________________ (1.1)<br />
*Address :<br />
______________________________________________________________________<br />
(*to be filled in after the Adjudicator has been appointed)<br />
The name and identification number of the Contract is<br />
Construction of <strong>Guest</strong> <strong>House</strong>, Office Building & Allied Works At Digha, West Bengal<br />
Bid No.: 03-SPMU/WB/W-22/2013-14<br />
59