44. Compensation Events<br />
44.1 The following are Compensation Events unless they are caused by the Contractor:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
(g)<br />
(h)<br />
(i)<br />
(j)<br />
(k)<br />
(l)<br />
The Employer does not give access to a part of the Site by the Site Possession Date stated in the<br />
Contract Data.<br />
The Employer modifies the schedule of other contractors in a way which affects the work of the<br />
contractor under the contract.<br />
The Engineer-in-charge orders a delay or does not issue drawings, specifications or instructions<br />
required <strong>for</strong> execution of works on time.<br />
The Engineer-in-charge instructs the Contractor to uncover or to carry out additional tests upon<br />
work which is then found to have no Defects.<br />
The Engineer-in-charge unreasonably does not approve <strong>for</strong> a subcontract to be let.<br />
Ground conditions are substantially more adverse than could reasonably have been assumed<br />
be<strong>for</strong>e issuance of Letter of Acceptance from the in<strong>for</strong>mation issued to Bidders (including the Site<br />
Investigation Reports), from in<strong>for</strong>mation available publicly and from a visual inspection of the<br />
Site.<br />
The Engineer-in-charge gives an instruction <strong>for</strong> dealing <strong>with</strong> an un<strong>for</strong>eseen condition, caused by<br />
the Employer, or additional work required <strong>for</strong> safety or other reasons.<br />
Other contractors, public authorities, utilities or the Employer does not work <strong>with</strong>in the dates and<br />
other constraints stated in the Contract, and they cause delay or extra cost to the Contractor.<br />
The advance payment is delayed.<br />
The effect on the Contractor of any of the Employer’s Risks.<br />
The Engineer-in-charge unreasonably delays issuing a Certificate of Completion.<br />
Other Compensation Events listed in the Contract Data or mentioned in the Contract.<br />
45. Tax<br />
44.2 If a Compensation Event would cause additional cost or would prevent the work being completed be<strong>for</strong>e<br />
the Intended Completion Date, the Contract Price shall be increased and/or the Intended Completion<br />
Date is extended. The Engineer-in-charge shall decide whether and by how much the Contract Price shall<br />
be increased and whether and by how much the Intended Completion Date shall be extended.<br />
44.3 As soon as in<strong>for</strong>mation demonstrating the effect of each Compensation Event upon the Contractor's<br />
<strong>for</strong>ecast cost has been provided by the Contractor, it is to be assessed by the Engineer-in-charge and the<br />
Contract Price shall be adjusted accordingly. If the Contractor's <strong>for</strong>ecast is deemed unreasonable, the<br />
Engineer-in-charge shall adjust the Contract Price based on Engineer-in-charge’s own <strong>for</strong>ecast. The<br />
Engineer-in-charge will assume that the Contractor will react competently and promptly to the event.<br />
44.4 The Contractor shall not be entitled to compensation to the extent that the Employer's interests are<br />
adversely affected by the Contractor not having given early warning or not having cooperated <strong>with</strong> the<br />
Engineer-in-charge.<br />
45.1 The rates quoted by the Contractor shall be deemed to be inclusive of all sales and other taxes that the<br />
Contractor will have to pay <strong>for</strong> the per<strong>for</strong>mance of this Contract. The Employer will per<strong>for</strong>m such duties<br />
in regard to the deduction of such taxes at source as per applicable law.<br />
46. Currencies<br />
46.1 All payments shall be made in Indian Rupees.<br />