BID Document for Guest House with Boundary Wall.pdf - Integrated ...
BID Document for Guest House with Boundary Wall.pdf - Integrated ... BID Document for Guest House with Boundary Wall.pdf - Integrated ...
TABLE __________________________________________________________________________________________ Package No. Name of work Approximate value of work (Rs.) Bid security (Rs.) Cost of document (Rs.) Period of completion 1 2 3 4 5 6 PK-1 Construction of Guest House, Office Building & Allied Works At Digha,West Bengal 3,76,14,000.00 3,76,000/- 2,000/- 12 months Project Director SPMU, ICZMP 4
SECTION 1: INSTRUCTIONS TO BIDDERS (ITB) 5
- Page 1 and 2: W-2 GOVERNMENT OF WEST BENGAL INTEG
- Page 3: GOVERNMENT OF WEST BENGAL INTEGRATE
- Page 7 and 8: A. General 1. Scope of Bid 1.1 The
- Page 9 and 10: (d) (e) The contractor or his ident
- Page 11 and 12: B. Bidding Documents 8. Content of
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.2 In evaluating the Bids, the Em
- Page 19 and 20: (ii) (iii) “fraudulent practice
- Page 21 and 22: Contractor's Bid Construction of Gu
- Page 23 and 24: Qualification Information The infor
- Page 25 and 26: 1.6 Qualifications and experience o
- Page 27 and 28: Integrated Coastal Zone Management
- Page 29 and 30: 2 To be used only if the Contractor
- Page 31 and 32: Agreement Form Agreement This agree
- Page 33 and 34: SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36: Conditions of Contract A. General 1
- Page 37 and 38: (5) Conditions of Contract includin
- Page 39 and 40: 16. Contractor to Construct the Wor
- Page 41 and 42: 28.1 The Engineer-in-charge shall e
- Page 43 and 44: timing of the work in the Variation
- Page 45 and 46: 47. Price Adjustment 47.1 Contract
- Page 47 and 48: the Engineer-in-charge shall issue
- Page 49 and 50: (i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52: d) Maternity Benefit Act 1951: The
- Page 53 and 54: 3. Assignment of the contract may b
TABLE<br />
__________________________________________________________________________________________<br />
Package<br />
No.<br />
Name of work<br />
Approximate value<br />
of work (Rs.)<br />
Bid security<br />
(Rs.)<br />
Cost of document<br />
(Rs.)<br />
Period of<br />
completion<br />
1 2 3 4 5 6<br />
PK-1 Construction of <strong>Guest</strong><br />
<strong>House</strong>, Office Building &<br />
Allied Works At<br />
Digha,West Bengal<br />
3,76,14,000.00 3,76,000/- 2,000/- 12 months<br />
Project Director<br />
SPMU, ICZMP<br />
4