Conditions of Contract<br />
Table of Contents<br />
A. General Page No. C. Quality Control Page No.<br />
1. Definitions 33 33. Identifying Defects 40<br />
2. Interpretation 34 34. Tests 40<br />
3. Language and Law 35 35. Correction of Defects 40<br />
4. Engineer's Decisions 35 36. Uncorrected Defects 40<br />
5. Delegation 35<br />
6. Communications 35<br />
7. Subcontracting 35 D. Cost Control<br />
8. Other Contractors 35 37. Bill of Quantities 40<br />
9. Personnel 38. Changes in the Quantities 40<br />
10. Employer’s & Contractor's Risks 36 39. Variations 40<br />
11. Employer's Risks 36 40. Payments <strong>for</strong> Variations 41<br />
12. Contractor’s Risks 36 41. Cash Flow Forecasts 41<br />
13. Insurance 36 42. Payment Certificates 41<br />
14. Site Investigation Reports 37 43. Payments 42<br />
15. Queries about the Contract 44. Compensation Events 42<br />
Data 37 45. Tax 43<br />
16. Contractor to Construct the 46. Currencies 43<br />
Works 37 47. Price Adjustments 43<br />
17. The Works to Be Completed by 48. Retention 44<br />
the Intended Completion Date 37 49. Liquidated Damages 44<br />
18. Approval by the Engineer 37 50. Bonus 44<br />
19. Safety 37 51. Advance Payment 44<br />
20. Discoveries 37 52. Securities 45<br />
21. Possession of the Site 37 53. Dayworks 45<br />
22. Access to the Site 38 54. Cost of Repairs 45<br />
23. Instructions 38<br />
24. Disputes 38<br />
25. Procedure <strong>for</strong> Disputes 38 E. Finishing the Contract<br />
26. Replacement of Adjudicator 38<br />
55. Completion 45<br />
B. Time Control 56. Taking Over 45<br />
27. Program 38 57. Final Account 45<br />
28. Extension of the Intended 58. Operating and Maintenance Manuals 45<br />
Completion Date 39 59. Termination 45<br />
29. Acceleration 39 60. Payment upon Termination 46<br />
30. Delays Ordered by the 61. Property 47<br />
Engineer 39 62. Release from Per<strong>for</strong>mance 47<br />
31. Management Meetings 39 63. Suspension of World Bank Loan 47<br />
32. Early Warning 39 or Credit<br />
F. Special Conditions of Contract 48<br />