Issue of Notice to proceed with the work (letterhead of the Employer) To ————— (date) —————————————— (name and address of the Contractor) —————————————— —————————————— Dear Sirs: Pursuant to your furnishing the requisite security as stipulated in ITB clause 34.1 and signing of the contract agreement for the Construction of -------------------------------- @ a Bid Price of Rs.---------------------, you are hereby instructed to proceed with the execution of the said works in accordance with the contract documents. Yours faithfully, (Signature, name and title of signatory authorized to sign on behalf of Employer) 30
Agreement Form Agreement This agreement, made the ___________________ day of ______________ 20_____, between [name and address of Employer] (hereinafter called “the Employer)” of the one part and ______________________________________________ ______________________________________________________________________________________________ __________________________________________________[name and address of contractor] (hereinafter called “the Contractor” ) of the other part. Whereas the Employer is desirous that the Contractor execute _ [name and identification number of Contract] (hereinafter called “the Works”) and the Employer has accepted the Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein, at a contract price of Rs. __________________________ NOW THIS AGREEMENT WITNESSETH as follows: 1. In this Agreement, words and expression shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to, and they shall be deemed to form and be read and construed as part of this Agreement. 2. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy any defects therein in conformity in all aspects with the provisions of the Contract. 3. The Employer hereby covenants to pay the Contractor in consideration of the execution and completion of the Works and the remedying the defects wherein the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract. 4. The following documents shall be deemed to form and be read and construed as part of this Agreement, viz.: i) Letter of Acceptance; ii) Notice to proceed with the works; iii) Contractor’s Bid; iv) Contract Data; v) Conditions of contract (including Special Conditions of Contract); vi) Specifications; vii) Drawings; viii) Bill of Quantities; and ix) Any other document listed in the Contract Data as forming part of the contract. 31
- Page 1 and 2: W-2 GOVERNMENT OF WEST BENGAL INTEG
- Page 3 and 4: GOVERNMENT OF WEST BENGAL INTEGRATE
- Page 5 and 6: SECTION 1: INSTRUCTIONS TO BIDDERS
- Page 7 and 8: A. General 1. Scope of Bid 1.1 The
- Page 9 and 10: (d) (e) The contractor or his ident
- Page 11 and 12: B. Bidding Documents 8. Content of
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.2 In evaluating the Bids, the Em
- Page 19 and 20: (ii) (iii) “fraudulent practice
- Page 21 and 22: Contractor's Bid Construction of Gu
- Page 23 and 24: Qualification Information The infor
- Page 25 and 26: 1.6 Qualifications and experience o
- Page 27 and 28: Integrated Coastal Zone Management
- Page 29: 2 To be used only if the Contractor
- Page 33 and 34: SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36: Conditions of Contract A. General 1
- Page 37 and 38: (5) Conditions of Contract includin
- Page 39 and 40: 16. Contractor to Construct the Wor
- Page 41 and 42: 28.1 The Engineer-in-charge shall e
- Page 43 and 44: timing of the work in the Variation
- Page 45 and 46: 47. Price Adjustment 47.1 Contract
- Page 47 and 48: the Engineer-in-charge shall issue
- Page 49 and 50: (i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52: d) Maternity Benefit Act 1951: The
- Page 53 and 54: 3. Assignment of the contract may b
- Page 55 and 56: S. No. Activity 3. Consultation and
- Page 57 and 58: S. No. Activity Measures to be Impl
- Page 59 and 60: Contract Data Items marked "N/A" do
- Page 61 and 62: (iv) Personal injury or death insur
- Page 63 and 64: The advance shall be repaid from ea
- Page 65 and 66: GENERAL SPECIFICATIONS 1.0 SCOPE OF
- Page 67 and 68: S. No. IS No. DESCRIPTION 1 IS-1200
- Page 69 and 70: 82 IS:2963 83 IS:3004 84 IS:3311 Wa
- Page 71 and 72: Bricks shall be of first class qual
- Page 73 and 74: e moved around the top edge of the
- Page 75 and 76: 8.9 Bar Bending Schedule: Concrete
- Page 77 and 78: 9.3 Protections And Curing The cont
- Page 79 and 80: DETAILED TECHNICAL SPECIFICATION FO
Issue of Notice to proceed <strong>with</strong> the work<br />
(letterhead of the Employer)<br />
To<br />
————— (date)<br />
—————————————— (name and address of the Contractor)<br />
——————————————<br />
——————————————<br />
Dear Sirs:<br />
Pursuant to your furnishing the requisite security as stipulated in ITB clause 34.1 and signing of<br />
the contract agreement <strong>for</strong> the Construction of --------------------------------<br />
@ a Bid Price of Rs.---------------------, you are hereby instructed to proceed <strong>with</strong> the execution of the<br />
said works in accordance <strong>with</strong> the contract documents.<br />
Yours faithfully,<br />
(Signature, name and title of<br />
signatory authorized to sign on<br />
behalf of Employer)<br />
30