BID Document for Guest House with Boundary Wall.pdf - Integrated ...
BID Document for Guest House with Boundary Wall.pdf - Integrated ... BID Document for Guest House with Boundary Wall.pdf - Integrated ...
Letter of Acceptance (letterhead paper of the Employer) ________________________[date] To: _________________________________________________________________________[name and address of the Contractor] Dear Sirs, This is to notify you that your Bid dated _______________________________for execution of the _ _______________________ ___________________________________________________________ [name of the contract and identification number, as given in the Instructions to Bidders] for the Contract Price of Rupees____________________________ [amount in words and figures], as corrected and modified in accordance with the Instructions to Bidders 1 is hereby accepted by our Agency. [OR] We accept/do not accept that __________________________ be appointed as the Adjudicator 2 . We note that as per bid, you do not intend to subcontract any component of work. We note that as per bid, you propose to employ M/s. .......................................... as sub-contractor for executing …......................................... [Delete whichever is not applicable]h You are hereby requested to furnish Performance Security, plus additional security for unbalanced bids in terms of ITB clause 29.5, in the form detailed in Para 34.1 of ITB for an amount of Rs.————— within 21 days of the receipt of this letter of acceptance valid upto 28 days from the date of expiry of Defects Liability Period i.e. upto ........... and sign the contract, failing which action as stated in Para 34.3 of ITB will be taken. We have reviewed the construction methodology submitted by you along with the bid in response to ITB Clause 4.3[k] and our comments are given in the attachment. You are requested to submit a revised program including environmental management plan as per Clause 27 of General Conditions of Contract within 14 days of receipt of this letter. Yours faithfully, Authorized Signature Name and Title of Signatory Name of Agency 1 Delete "corrected and" or "and modified" if only one of these actions applies. Delete "as corrected and modified in accordance with the Instructions to Bidders" if corrections or modifications have not been effected. 28
2 To be used only if the Contractor disagrees in his Bid with the Adjudicator proposed by the Employer in the "Instructions to Bidders." 29
- Page 1 and 2: W-2 GOVERNMENT OF WEST BENGAL INTEG
- Page 3 and 4: GOVERNMENT OF WEST BENGAL INTEGRATE
- Page 5 and 6: SECTION 1: INSTRUCTIONS TO BIDDERS
- Page 7 and 8: A. General 1. Scope of Bid 1.1 The
- Page 9 and 10: (d) (e) The contractor or his ident
- Page 11 and 12: B. Bidding Documents 8. Content of
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.2 In evaluating the Bids, the Em
- Page 19 and 20: (ii) (iii) “fraudulent practice
- Page 21 and 22: Contractor's Bid Construction of Gu
- Page 23 and 24: Qualification Information The infor
- Page 25 and 26: 1.6 Qualifications and experience o
- Page 27: Integrated Coastal Zone Management
- Page 31 and 32: Agreement Form Agreement This agree
- Page 33 and 34: SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36: Conditions of Contract A. General 1
- Page 37 and 38: (5) Conditions of Contract includin
- Page 39 and 40: 16. Contractor to Construct the Wor
- Page 41 and 42: 28.1 The Engineer-in-charge shall e
- Page 43 and 44: timing of the work in the Variation
- Page 45 and 46: 47. Price Adjustment 47.1 Contract
- Page 47 and 48: the Engineer-in-charge shall issue
- Page 49 and 50: (i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52: d) Maternity Benefit Act 1951: The
- Page 53 and 54: 3. Assignment of the contract may b
- Page 55 and 56: S. No. Activity 3. Consultation and
- Page 57 and 58: S. No. Activity Measures to be Impl
- Page 59 and 60: Contract Data Items marked "N/A" do
- Page 61 and 62: (iv) Personal injury or death insur
- Page 63 and 64: The advance shall be repaid from ea
- Page 65 and 66: GENERAL SPECIFICATIONS 1.0 SCOPE OF
- Page 67 and 68: S. No. IS No. DESCRIPTION 1 IS-1200
- Page 69 and 70: 82 IS:2963 83 IS:3004 84 IS:3311 Wa
- Page 71 and 72: Bricks shall be of first class qual
- Page 73 and 74: e moved around the top edge of the
- Page 75 and 76: 8.9 Bar Bending Schedule: Concrete
- Page 77 and 78: 9.3 Protections And Curing The cont
2<br />
To be used only if the Contractor disagrees in his Bid <strong>with</strong> the Adjudicator proposed by the Employer in the<br />
"Instructions to Bidders."<br />
29