@The item of work <strong>for</strong> which data is requested should tally <strong>with</strong> that specified in ITB clause 4.5A(c).<br />

** immediately preceding the financial year in which bids are received.β Attach certificate from Chartered<br />

Accountant.<br />

1.4 In<strong>for</strong>mation on Bid Capacity (works <strong>for</strong> which bids have been submitted and works which are yet to be<br />

completed) as on the date of this bid.<br />

(A) Existing commitments and on-going works:<br />

0<br />

____________________________________________________________________________________________<br />

Description Place Contract No. Name Value of Stipulated Value of works* Anticipated<br />

of & & Date and Contract period of remaining to be date of<br />

Work State Address (Rs. million) completion completed completion<br />

of Employer<br />

(Rs. million)<br />

(1) (2) (3) (4) (5) (6) (7) (8)<br />

____________________________________________________________________________________________<br />

__________________________________________________________________________________________<br />

(B) Works <strong>for</strong> which bids already submitted:<br />

____________________________________________________________________________________________<br />

Description Place Name and Estimated Stipulated Date when Remarks<br />

of & Address of value of works period of decision is if any<br />

Work State Employer (Rs. million) completion expected<br />

(1) (2) (3) (4) (5) (6) (7)<br />

* Attach certificate(s) from the Engineer(s)-in-Charge.<br />

1.5 The following items of Contractor's Equipment are essential <strong>for</strong> carrying out the Works. The Bidder should list<br />

all the in<strong>for</strong>mation requested below. Refer also to Sub Clause 4.3 (d) of the Instructions to Bidders.<br />

_______________________________________________________________________________________<br />

Item of Requirement Availability proposals Remarks<br />

equipment No. Capacity Owned/leased/ Nos/ Age/ (From whom to be<br />

to be procured capacity condition purchased)<br />

_______________________________________________________________________________________<br />

Concrete Mixture * * * * * * *<br />

Excavator * * * * * * *<br />

Needle vibrator<br />

plate vibrator<br />

Truck/Tipper<br />

5 H.P water pump<br />

_______________________________________________________________________________________<br />