Qualification In<strong>for</strong>mation<br />
The in<strong>for</strong>mation to be filled in by the Bidder in the following pages will be used <strong>for</strong> purposes of post qualification as<br />
provided <strong>for</strong> in Clause 4 of the Instructions to Bidders. This in<strong>for</strong>mation will not be incorporated in the Contract.<br />
1. For Individual Bidders<br />
1.1 Constitution or legal status of Bidder<br />
[Attach copy]<br />
Place of registration:<br />
Principal place of business:<br />
_______________________________<br />
_______________________________<br />
Power of attorney of signatory of Bid<br />
[Attach]<br />
1.2 Total value of Civil Engineering construction work and<br />
Design, Supply and construction of sewage lifting station,<br />
pumping Station and allied works<br />
executed and payment received in the last five years.<br />
**<br />
(in Rs.Lakh)<br />
2008-2009_____________________β<br />
2009-2010_____________________<br />
2010-2011_____________________<br />
2011-2012_____________________<br />
2012-2013_____________________<br />
1.3.1 Work per<strong>for</strong>med as prime contractor (in the same name) on works of a similar nature over the last five years.<br />
**<br />
____________________________________________________________________________________________<br />
Project<br />
Name<br />
Name<br />
of the<br />
Employer*<br />
Description<br />
of<br />
work<br />
Contract<br />
No.<br />
Value of<br />
contract<br />
(Rs.<br />
Million)<br />
Date of<br />
issue of<br />
work<br />
order<br />
Stipulated<br />
period of<br />
completion<br />
Actual date<br />
of<br />
completion*<br />
Remarks<br />
explaining<br />
reasons <strong>for</strong><br />
delay and<br />
work<br />
completed<br />
____________________________________________________________________________________________<br />
____________________________________________________________________________________________<br />
1.3.2 Quantities of work executed as prime contractor (in the same name and style) in the last five years: **<br />
Year Name Name Remarks *<br />
of the of the Cement concrete E/works<br />
Work Employer* (including<br />
RCC&PCC)<br />
2008-2009<br />
2009-2010<br />
2010-2011<br />
2011-2012<br />
2012-2013<br />
*Attach certificate(s) from the Engineer(s)-in-Charge<br />
23<br />
Masonry<br />
work<br />
(indicate contract<br />
Ref)