- Page 1 and 2:
W-2 GOVERNMENT OF WEST BENGAL INTEG
- Page 3 and 4:
GOVERNMENT OF WEST BENGAL INTEGRATE
- Page 5 and 6:
SECTION 1: INSTRUCTIONS TO BIDDERS
- Page 7 and 8:
A. General 1. Scope of Bid 1.1 The
- Page 9 and 10:
(d) (e) The contractor or his ident
- Page 11 and 12:
B. Bidding Documents 8. Content of
- Page 13 and 14:
15.2 In exceptional circumstances,
- Page 15 and 16:
20.2 The Employer may extend the de
- Page 17 and 18:
29.2 In evaluating the Bids, the Em
- Page 19 and 20:
(ii) (iii) “fraudulent practice
- Page 21 and 22:
Contractor's Bid Construction of Gu
- Page 23 and 24:
Qualification Information The infor
- Page 25 and 26:
1.6 Qualifications and experience o
- Page 27 and 28:
Integrated Coastal Zone Management
- Page 29 and 30:
2 To be used only if the Contractor
- Page 31 and 32:
Agreement Form Agreement This agree
- Page 33 and 34:
SECTION 3: CONDITIONS OF CONTRACT 3
- Page 35 and 36:
Conditions of Contract A. General 1
- Page 37 and 38:
(5) Conditions of Contract includin
- Page 39 and 40:
16. Contractor to Construct the Wor
- Page 41 and 42:
28.1 The Engineer-in-charge shall e
- Page 43 and 44:
timing of the work in the Variation
- Page 45 and 46:
47. Price Adjustment 47.1 Contract
- Page 47 and 48:
the Engineer-in-charge shall issue
- Page 49 and 50:
(i) (ii) (iii) (iv) (v) “corrupt
- Page 51 and 52:
d) Maternity Benefit Act 1951: The
- Page 53 and 54:
3. Assignment of the contract may b
- Page 55 and 56:
S. No. Activity 3. Consultation and
- Page 57 and 58:
S. No. Activity Measures to be Impl
- Page 59 and 60:
Contract Data Items marked "N/A" do
- Page 61 and 62:
(iv) Personal injury or death insur
- Page 63 and 64:
The advance shall be repaid from ea
- Page 65 and 66:
GENERAL SPECIFICATIONS 1.0 SCOPE OF
- Page 67 and 68:
S. No. IS No. DESCRIPTION 1 IS-1200
- Page 69 and 70:
82 IS:2963 83 IS:3004 84 IS:3311 Wa
- Page 71 and 72:
Bricks shall be of first class qual
- Page 73 and 74:
e moved around the top edge of the
- Page 75 and 76:
8.9 Bar Bending Schedule: Concrete
- Page 77 and 78:
9.3 Protections And Curing The cont
- Page 79 and 80:
DETAILED TECHNICAL SPECIFICATION FO
- Page 81 and 82: 6.0 SHORING WORKS 6.1 General: Shor
- Page 83 and 84: When testing a pipeline hydraulical
- Page 85 and 86: (i) (ii) (iii) procurement & supply
- Page 87 and 88: the worst weather and flooding cond
- Page 89 and 90: All valves shall be provided with c
- Page 91 and 92: SECTION 6: Layout Drawings of the w
- Page 93 and 94: SCHEDULE OF QUANTITIES FOR GUEST HO
- Page 95 and 96: 2 Brick work with 1st class bricks
- Page 97 and 98: smooth finish acrylic exterior emul
- Page 99 and 100: complete.(Payment to be made on bas
- Page 101 and 102: approved brand (size not less than
- Page 103 and 104: and including smoothening surface b
- Page 105 and 106: 8.1 5/6 amps switch Each 30 8.2 15/
- Page 107 and 108: sets of G.I. nut bolt & spring wash
- Page 109 and 110: power unit having suitable rating S
- Page 111 and 112: as required. 19.0 Installation of e
- Page 113 and 114: 40.2 63 Amp DP Each 1 41.0 Providin
- Page 115 and 116: (i) 590 mm X 390 mm X 380 mm 9 Supp
- Page 117 and 118: clamps 750 mm long 4 Installation o
- Page 119 and 120: all specials . No separate payment
- Page 121 and 122: stacking the spills within a lead o
- Page 123 and 124: cc manhole cover of approved make s
- Page 125 and 126: acing for concrete slabs , beams, a
- Page 127 and 128: 4.0 Laying and fixing of one number
- Page 129 and 130: The rate shall be inclusive of supp
- Page 131: Note: (1) Item for which no rate or
- Page 135 and 136: PERFORMANCE BANK GUARANTEE To: ____
- Page 137: BANK GUARANTEE FOR ADVANCE PAYMENT