First Implementation Support Mission, June 2011<br />
Component<br />
Allocated<br />
(million SDR)<br />
Disbursed<br />
(million SDR)<br />
Balance<br />
(million SDR)<br />
Disbursement<br />
(%)<br />
A 44.14 0.17 43.97 0.4%<br />
B 38.125 0.64 37.48 1.7%<br />
C 25.355 0.11 25.25 0.4%<br />
D 38.55 0.07 38.48 0.2%<br />
PPF advance 0.73 0.65 0.08 89.0%<br />
DA 6.30 -6.30<br />
Total 146.90 7.94 138.96 5.41%<br />
Accounting system:<br />
8. SICOM (or NPMU): The NPMU has installed and operationalized Tally accounting system. The financial<br />
reports are being generated based on Tally records. The accounting records are up to date at NPMU. SOI<br />
(one of the national level PEA) has initiated implementation of Tally accounting system and has achieved<br />
good progress. However it would require guidance from NPMU on streamlining the chart of accounts and<br />
accounting entries to be captured. NPMU had provided training for the accounting staff and refresher<br />
training is expected to be provided before 31 July 2011. The SOI books of account in Tally are expected<br />
to be up to date by 31 August 2011. Further, due to the government style accounting legacy, SOI has<br />
treated some of the advances as expenditure and has claimed the same from the World Bank. This needs<br />
to be corrected in the next IUFR.<br />
9. Gujarat: SPMU and all PEAs have installed and opertaionalized the Tally accounting system. Financial<br />
reports are being generated based on Tally records. The accounting records are up to date at SPMU.<br />
10. Odisha: Tally has been installed in SPMU and all PEAs. However, Tally is functioning in 5 PEAs and in<br />
other PEAs it is expected to be made functional by 31st August 2011. The project accounts have been<br />
updated until 31 March 2011.<br />
11. West Bengal: SPMU has installed Tally accounting system while none of the PEAs has installed the<br />
software. SPMU will initiate the Tally installation within two months, followed by training support to the<br />
PEAs. SPMU will operationalize Tally at PEAs before 30 September 2011. The project accounts have<br />
been updated until 31st March 2011.<br />
<strong>Project</strong>-specific bank accounts set up<br />
12. The SICOM and all SPMU’s have setup the bank accounts and banking arrangements as agreed with the<br />
World Bank. The following are the details state wise:<br />
a. Gujarat: The bank accounts have been created for the SPMU and all PEAs in Corporation Bank.<br />
b. Odisha: The bank accounts have been created for the SPMU and PEAs in State Bank of India. In<br />
case of OSDMA, the bank account has been opened with Allahabad Bank for operational ease.<br />
c. West Bengal: The bank accounts have been created for the SPMU and 9 PEAs in United Bank of<br />
India. For Public health engineering department the PEA bank accounts are yet to be opened and<br />
this needs to be completed by 31st July 2011.<br />
65