First Implementation Support Mission, June 2011<br />
Activity Current Progress Agreed Next Steps & World Bank Recommendations<br />
[1C]<br />
<strong>Coastal</strong><br />
Sediment cell<br />
mapping<br />
[1D]<br />
National Centre<br />
for <strong>Coastal</strong> <strong>Zone</strong><br />
<strong>Management</strong>.<br />
contracting). SICOM and MSSRF has already prepared a plan of actions over the next<br />
3 years, focusing on composite mangrove, halophytes and related capacity building of<br />
communities. These proposals are acceptable to the Bank.<br />
3. Vembanad: MOEF and the State Government have agreed to declare Vembanad in<br />
Kerala as an ESA. The actual mapping and the integrated area development plan<br />
proposals are yet to be developed.<br />
4. The CRZ Notification 2011 has identified the initial list of 13 ESAs (called Critical<br />
Vulnerable <strong>Coastal</strong> Areas or CVCAs). These are Gulf of Kachchh and Gulf of<br />
Khambat (Gujarat), Malvan and Achra-Ratnagiri (in Maharashtra), Karwar and<br />
Coondapur (in Karnataka), Vembanad (in Kerala), Gulf of Mannar (in Tamil Nadu),<br />
Coringa, East Godavari Delta and Krishna Delta (in Andhra Pradesh), Bhitarkanika<br />
(in Odisha), and Sundarban mangrove areas (in West Bengal). Mapping and<br />
stakeholder discussions on each are yet to start.<br />
5. No work has yet started on (1) finalizing the comprehensive guidelines for<br />
identification, mapping and preparation of integrated plans for the ESAs; (2) a<br />
comprehensive analysis of potential ESAs covering the entire coastal and marine<br />
areas in India.<br />
1. A 2 day workshop was organized in Bhubaneswar to discuss the specific scope of<br />
coastal sediment cell mapping. During the workshop the modalities of mapping was<br />
agreed. A preliminary map for major sediment cells was also prepared, and the ways<br />
of refining the method was discussed. The workshop also discussed the context of this<br />
sediment cell mapping in relation to the coastal process studies, and the issue of<br />
forward looking preparation of shoreline management plans.<br />
2. NCSCM has included mapping of sediment cells and sub-cells as one of the priority<br />
research work in their program.<br />
1. MOEF and Anna University signed an MOU specifying the roles and responsibilities<br />
of either party. Anna University agreed to provide 5 acres of land within the Anna<br />
University campus for the NCSCM.<br />
2. The Senate of the Anna University has approved transfer of the land to NCSCM.<br />
Further activities for formal transfer of land to NCSCM (and mutation) is under<br />
progress.<br />
3. NCSCM has been established as a society under the Tamil Nadu Societies registration<br />
Act. The memorandum of agreement and the bye-laws had been agreed by all parties<br />
including the MOEF.<br />
4. NCSCM will prepare a plan and schedule for<br />
identification, mapping and preparation of integrated<br />
plans for all ESAs (in collaboration with National<br />
Partner Institutions) by December 2011.<br />
5. To be covered in the NCSCM plan and schedule<br />
referred above.<br />
NCSCM will prepare a detailed statement on the process<br />
and schedule of mapping coastal sediment cells and<br />
sub-cells. This detailed statement, showing resource<br />
requirements for desk analysis, field investigation and<br />
identification of the cause-effect relationships will be<br />
prepared by Dec 2011; such that the work can be fully<br />
completed by Dec 2012.<br />
1. Nil.<br />
2. NCSCM will ensure that all land registration process<br />
is completed by October 2011.<br />
3. Nil.<br />
4. Nil.<br />
5. SICOM will select the interview panels; and explain<br />
the detailed selection criteria to ensure highly qualified<br />
young professionals are offered a job in NCSCM.<br />
24