Key Assumptions which will form part<br />

of our Investment Case<br />

• Operational:<br />

• Operational start - EPR 1, 2018; EPR 2, 18 months after<br />

• Operating Life - 60 years<br />

• Construction:<br />

• Based on Flamanville 3 design, updated for UK specifications<br />

• Reflects UK tendered contracts (e.g. Nuclear Steam Supply System<br />

and turbine generator)<br />

• O&M:<br />

• Based on experience of French fleet, updated for UK specifications<br />

• Include fuel, ongoing O&M, transmission costs, insurance and business rates<br />

• Waste and Decommissioning:<br />

• Based on Funded Decommissioning Plan being negotiated with UK Government