Key Risk Milestones to be met before Final<br />

Investment Decision: traffic lights (2/2)<br />

Autumn<br />

2010<br />

Winter 2010<br />

/ 2011<br />

Spring 2011<br />

Summer<br />

2011<br />

Autumn<br />

2011<br />

Winter 2011<br />

/ 2012<br />

Spring 2012<br />

Summer<br />

2012<br />

IPC<br />

Consent<br />

Development Consent Order<br />

Application to IPC<br />

IPC Consent<br />

Granted<br />

Site<br />

Excavation<br />

Planning<br />

Permission<br />

Received<br />

Planning Permission<br />

Granted<br />

Nuclear<br />

Site<br />

Licence<br />

Granted<br />

Formal Nuclear Site<br />

Licence Submission<br />

Nuclear Site Licence Granted<br />

GDA-DAC<br />

NII approves Long Lead<br />

Item Procurement<br />

Interim Design Acceptance<br />

Confirmation Issued<br />

Final Design Acceptance<br />

Confirmation Issued<br />

IPC : Infrastructure and Planning Commission<br />

GDA-DAC: Generic Design Assesment<br />

Note: December 17th 2010 is denoted by