25.04.2015 Views

EDF Energy - Finance

EDF Energy - Finance

EDF Energy - Finance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MARKET REFORM<br />

Consenting<br />

Licensing<br />

Design<br />

Procurement<br />

Manufacturing<br />

Construction<br />

Commissioning<br />

Operations<br />

Decommissioning<br />

Our project organisation is up and running<br />

NNB Owner/Operator<br />

• Organisation up and<br />

running and working<br />

as one team<br />

• <strong>EDF</strong> <strong>Energy</strong> and the<br />

Architect Engineer (1)<br />

working to incorporate<br />

lessons learnt from<br />

earlier EPR projects<br />

• Clear responsibility<br />

and accountability<br />

NNB Design and Quality Assurance<br />

(1) <strong>EDF</strong> French Engineering Division<br />

Architect Engineer<br />

(<strong>EDF</strong> French Engineering<br />

Division)<br />

NNB<br />

(<strong>EDF</strong> <strong>Energy</strong> Owner<br />

/ Operator)<br />

Architect Engineer /<br />

NNB Shared<br />

Key Interface

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!