We aim to build up to four nuclear<br />

power stations in the UK<br />

• Our plan: up to four nuclear power stations subject<br />

to receiving the necessary consents and to a robust<br />

investment framework being in place<br />

• Targeted locations:<br />

• Twin at Hinkley Point (first unit commissioned by 2018)<br />

• Twin at Sizewell (subject to ongoing studies)<br />

• Build on <strong>EDF</strong> Group's fleet effect and feedback: Flamanville 3<br />

and Taishan 1&2<br />

• Centrica 20% partner with a potential for further partnership