25.04.2015 Views

EDF Energy - Finance

EDF Energy - Finance

EDF Energy - Finance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EPR: a series of several projects that will<br />

benefit from the feedback from one project<br />

to another<br />

Flamanville 3 Flamanville 3<br />

Penly 3<br />

Hinkley<br />

Point 2<br />

4.5<br />

months<br />

Taishan<br />

1<br />

months<br />

47<br />

weeks<br />

Taishan<br />

10<br />

weeks<br />

Hinkley<br />

Point 1<br />

Concrete<br />

pouring<br />

Fixing<br />

of containment<br />

liner<br />

Taishan 2<br />

• Reactor base done in one<br />

pour to improve efficiency<br />

Taishan 1<br />

• Civil works feedback to optimise<br />

construction methods<br />

Flamanville<br />

3<br />

• Issue with liner containment building<br />

• Prefabrication of dome and liner leading<br />

to efficient welding to improve quality<br />

and time

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!