China : Taishan 1 & 2<br />

• <strong>EDF</strong> is co-investor/operator with CGNPC for 2 EPR in Taishan<br />

• The Taishan project uses Flamanville 3 as a reference model<br />

after taking into account the initial feedback<br />

Concrete pouring methods and liner welding procedures took advantage<br />

from Flamanville’s feedback<br />

• The Taishan project<br />

is on time:<br />

• First concrete poured in October<br />

2009 for unit 1 and April 2010<br />

for unit 2<br />

• Lifting of the module 1 of the liner<br />

of the reactor building<br />

of unit 1 in March 2010<br />

• Commissioning date<br />

expected in 2014 Taishan 1 : Liner module 1 lifting March 2010