25.04.2015 Views

EDF Energy - Finance

EDF Energy - Finance

EDF Energy - Finance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2010: a challenging year with<br />

a good underlying AGR performance<br />

• 2009 - a successful year in terms of nuclear output with output<br />

at 55.1TWh being 1.5TWh better than plan<br />

• 2010 - a more challenging year in terms of nuclear output<br />

• Significant losses have come from a handful of large loss events:<br />

• Sizewell B Pressuriser c.6TWh<br />

• Heysham 2 ISI Plug c.3TWh<br />

• Dungeness B R21 Header Inspections c.3TWh<br />

• Underlying AGR fleet output comparable to 2009 and better<br />

than recent years<br />

• Safety performance remains very strong and improving<br />

• Heysham 1 and Hartlepool additional 5-year life extension<br />

now announced

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!