CONTRACTOR SAFETY<br />

STANDARD<br />

<strong>The</strong> contractor provides a safe, hygienic and healthy workplace setting and takes necessary steps to<br />

prevent accidents and injury arising out of, linked with or occurring in the course of work or as result of<br />

the operation of contractor’s facilities. <strong>The</strong> contractor has systems to detect, avoid and respond to<br />

potential risks to the safety and health of all employees.<br />

‣ Develop and implement process and procedures to reduce or eliminate health, safety and<br />

environment risk associated with contractor and subcontractor activities.<br />

RESPONSIBILITIES<br />

Location Manager must ensure that contractor safety procedures are developed, implemented and<br />

followed.<br />

HSE Representative must establish, maintain and administer the contractor safety program.<br />

Contractor Contact must ensure that affected contractors and affected employees are trained and<br />

adhere to the requirements of the contractor safety program.<br />

Managers and Supervisors must ensure that the affected contractor contact and employees are<br />

trained and adhere to the requirements of the contractor safety program.<br />

Contractors and Employees must adhere to the requirements of the contractor safety program.<br />

DEFINITIONS<br />

• Contractor contact is the individual responsible for the coordination of contractor or subcontractor<br />

project work activities.<br />

REQUIREMENTS<br />

1. RISK ASSESSMENT—Each facility must have a documented risk assessment performed, which<br />

includes as a minimum:<br />

a. Tasks and associated hazards that may be contracted or subcontracted.<br />

b. Evaluation of risk associated with the listed hazards.<br />

c. Identification of control measures to reduce or eliminate the risk.<br />

2. QUALIFICATION—Each facility must have qualification processes for any contractor or<br />

subcontractor performing equipment or facility maintenance or is performing tasks with greater<br />

than “low” risk. Qualification processes as a minimum include:<br />

a. Prequalification form completed by each affected contractor which includes:<br />

• Historical ESH performance.<br />

• Minimum liability insurance requirements ($1 million USD per incident/$2 million USD<br />

aggregate recommended).<br />

• Implementation of applicable safety programs and training.<br />

b. Evaluation process for accepting or rejecting contractors.<br />

<strong>Safety</strong> <strong>CLS</strong> – Page 1<br />