23.04.2015 Views

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rapid Environmental Impact Assessment (REIA) Study <strong>for</strong> Proposed Integrated Complex <strong>for</strong> Delhi Judicial Academy,<br />

National Law School, and National Institute <strong>for</strong> Mediation & Conciliation at Dwarka, New Delhi<br />

7.2.7 Traffic Pattern…………………………………………………………………. 129<br />

7.3 Mitigation Measures during Operation……………………………………. 129<br />

7.3.1 Air Quality……………………………………………………………………... 129<br />

7.3.2 Noise……………………………………………………………………………. 129<br />

7.3.3 Land Environment…………………………………………………………….. 130<br />

7.3.4 Ground Water Quality and Quantity……………………………………….. 130<br />

7.3.5 Infrastructure………………………………………………………………….. 130<br />

7.3.6 Traffic Pattern…………………………………………………………………. 130<br />

7.4 Human Health and Safety Management Plan……………………………… 131<br />

7.5 Fire Safety and Protection…………………………………………………. 132<br />

7.6 Rainwater Harvesting Plan………………………………………………… 133<br />

7.7 Landscaping and Green Belt Development Plan…………………………... 135<br />

7.8 Vehicle Parking and Management Plan…………………………………… 136<br />

7.9 Energy Conservation Plan…………………………………………………. 139<br />

8. Environmental Monitoring Plan……………………………. 141-142<br />

8.1 Ambient Air Quality………………………………………………………. 141<br />

8.2 Ambient Noise Quality……………………………………………………. 141<br />

8.3 Ground Water Quality…………………………………………………….. 142<br />

8.4 Wastewater Quality………………………………………………………... 142<br />

9. Cost Estimates………………………………………………… 143<br />

LIST OF TABLES<br />

Table 3.1 Details of Proposed Built up Area of Academic Complex.…………... 27<br />

Table 3.2 Details of Proposed Built up Area of Residential Buildings…………. 28<br />

Table 3.3 Proposed Land Use <strong>for</strong> the Integrated Complex……………………… 29<br />

Table 3.4 Estimated Quantities of Construction Materials……………………… 42<br />

Table 3.5 Proposed Integrated Judicial Complex Construction Schedule………. 43<br />

Table 4.1 Summary of Data Collection from Various Sources…………………. 50<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!