Rapid Environmental Impact Assessment (REIA) Study <strong>for</strong> Proposed Integrated Complex <strong>for</strong> Delhi Judicial Academy,<br />

National Law School, and National Institute <strong>for</strong> Mediation & Conciliation at Dwarka, New Delhi<br />

Section 5: Anticipated positive and negative impacts as a result of the construction and operation of<br />

the <strong>proposed</strong> project are covered as a part of this section. The section attempts to <strong>for</strong>ecast the future<br />

environmental conditions of the project area that might be expected to occur as a result of the<br />

construction and operation of the <strong>proposed</strong> project.<br />

Section 6: This section gives the environmental impact statement based on the identification,<br />

prediction and evaluation of impacts.<br />

Section 7: Environmental Management Plan (EMP) <strong>for</strong> amelioration of anticipated adverse impacts<br />

likely to accrue as a result of the <strong>proposed</strong> project is outlined in this section. The approach <strong>for</strong><br />

<strong>for</strong>mulation of an EMP was to maximize the positive environmental impacts and minimize the<br />

negative ones.<br />

Section 8: Environmental Monitoring Programme <strong>for</strong> implementation during project construction<br />

and operation phases has also been delineated in this section. The objective of environmental<br />

monitoring programme is to assess the adequacy of various environmental safeguards and to<br />

compare the predicted and actual scenario during construction and operation phases. This enables<br />

suggestion of remedial measures not <strong>for</strong>eseen during the planning stage but arising during these<br />

phases.<br />

Section 9: The estimated cost <strong>for</strong> implementation of suggested environmental management<br />

measures.<br />

1.8 Project Proponent Name and Contact<br />

The name and contact of the project proponent and architects are:<br />

Project Proponent<br />

Government of National Capital Territory (NCT) of Delhi,<br />

(Through Executive Engineer)<br />

PWD Division, Zone - I<br />

New Delhi<br />

Architects<br />

Behal Joshi and Associates<br />

(Architects and Interior Designers)<br />

P – 9, Hauz Khas Enclave,<br />

New Delhi – 110016<br />

17