23.04.2015 Views

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rapid Environmental Impact Assessment (REIA) Study <strong>for</strong> Proposed Integrated Complex <strong>for</strong> Delhi Judicial Academy,<br />

National Law School, and National Institute <strong>for</strong> Mediation & Conciliation at Dwarka, New Delhi<br />

Ambient noise level within the <strong>complex</strong> will be monitored <strong>for</strong> L day , L night and L dn during<br />

the operation phase of the project at appropriate locations. The frequency of monitoring<br />

shall be once in six months.<br />

8.3 Ground Water Quality<br />

Construction Phase<br />

Ground water (if any) used <strong>for</strong> the construction and human consumption shall be<br />

monitored <strong>for</strong> the desired parameters as per BIS standards once in every month.<br />

Operation Phase<br />

It is also <strong>proposed</strong> to analyze ground water samples <strong>for</strong> the essential parameters once in<br />

every six months to ascertain any change in its quality due to regular usage.<br />

8.4 Wastewater Quality<br />

During project operation phase, a sewage treatment plant (STP) has been <strong>proposed</strong> to<br />

treat the sewage from both academic and residential <strong>complex</strong>. It is <strong>proposed</strong> to analyze a<br />

sample each be<strong>for</strong>e and after the STP once every <strong>for</strong>tnight. The parameters to be<br />

analyzed include pH, oil and grease, total suspended solids, total dissolved solids, BOD,<br />

and COD.<br />

139

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!