23.04.2015 Views

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

proposed integrated complex for delhi judicial academy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rapid Environmental Impact Assessment (REIA) Study <strong>for</strong> Proposed Integrated Complex <strong>for</strong> Delhi Judicial Academy,<br />

National Law School, and National Institute <strong>for</strong> Mediation & Conciliation at Dwarka, New Delhi<br />

• The project will take prior permission from the competent authority <strong>for</strong> disposal of<br />

construction waste on landfill site in the project area.<br />

• It will be ensured that no construction spoils of any unsuitable material are disposed<br />

off on roadside or any other place in the project area.<br />

• Construction debris will be collected and suitably used on site as per construction<br />

waste management plan<br />

7.2.4 Hazards to Construction Workers and the Local Population<br />

• Careful attention to design and maintenance of earthworks and drainage systems<br />

during construction to avoid creation of significant habitat areas <strong>for</strong> mosquito larvae.<br />

• Use of larvicides may be required to prevent mosquito breeding in silt traps.<br />

7.2.5 Ground Water Quality and Quantity<br />

• Contractor will arrange adequate supply and storage of water <strong>for</strong> the whole<br />

construction period.<br />

• The water requirement during construction will be mainly met through tankers.<br />

• Alternate water supply will also be met through ground water but after taking<br />

permission from Delhi Water Board. If permitted, balanced approach will be followed<br />

towards utilization of ground water in construction work.<br />

• The contractor will take all precautions to minimize the wastage of water in the<br />

construction process.<br />

7.2.6 Housing and Transportation of Construction Workers<br />

• The project will provide kerosene or cooking gas to the construction workers on-site<br />

so that they do not resort to using fuel wood <strong>for</strong> cooking.<br />

• Temporary sanitary facilities shall be provided on-site and proper hygienic conditions<br />

are maintained.<br />

123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!