proposed integrated complex for delhi judicial academy
proposed integrated complex for delhi judicial academy
proposed integrated complex for delhi judicial academy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rapid Environmental Impact Assessment (REIA) Study <strong>for</strong> Proposed Integrated Complex <strong>for</strong> Delhi Judicial Academy,<br />
National Law School, and National Institute <strong>for</strong> Mediation & Conciliation at Dwarka, New Delhi<br />
• The project will take prior permission from the competent authority <strong>for</strong> disposal of<br />
construction waste on landfill site in the project area.<br />
• It will be ensured that no construction spoils of any unsuitable material are disposed<br />
off on roadside or any other place in the project area.<br />
• Construction debris will be collected and suitably used on site as per construction<br />
waste management plan<br />
7.2.4 Hazards to Construction Workers and the Local Population<br />
• Careful attention to design and maintenance of earthworks and drainage systems<br />
during construction to avoid creation of significant habitat areas <strong>for</strong> mosquito larvae.<br />
• Use of larvicides may be required to prevent mosquito breeding in silt traps.<br />
7.2.5 Ground Water Quality and Quantity<br />
• Contractor will arrange adequate supply and storage of water <strong>for</strong> the whole<br />
construction period.<br />
• The water requirement during construction will be mainly met through tankers.<br />
• Alternate water supply will also be met through ground water but after taking<br />
permission from Delhi Water Board. If permitted, balanced approach will be followed<br />
towards utilization of ground water in construction work.<br />
• The contractor will take all precautions to minimize the wastage of water in the<br />
construction process.<br />
7.2.6 Housing and Transportation of Construction Workers<br />
• The project will provide kerosene or cooking gas to the construction workers on-site<br />
so that they do not resort to using fuel wood <strong>for</strong> cooking.<br />
• Temporary sanitary facilities shall be provided on-site and proper hygienic conditions<br />
are maintained.<br />
123