23.04.2015 Views

Component Catalogue - Lifting Systems 07/05/2013 - KLH

Component Catalogue - Lifting Systems 07/05/2013 - KLH

Component Catalogue - Lifting Systems 07/05/2013 - KLH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

M a d e f o r b u i l d i n g<br />

b u i l t f o r l i v i n g<br />

Lif t ing Sys tem s<br />

CE - MARKED


I M P R I N T<br />

© <strong>KLH</strong> Massivholz GmbH<br />

Publisher and responsible for content: <strong>KLH</strong> Massivholz GmbH<br />

Version: 01/<strong>2013</strong>, <strong>Lifting</strong> <strong>Systems</strong> – CE - marked<br />

The content of this brochure is the intellectual property of the company<br />

and is protected by copyright. Any kind of reproduction of this document is<br />

strictly prohibited unless otherwise agreed in writing by the publisher.


C O N T E N T<br />

01 VISIBLE FACTORY FIT TED LIF TING SYSTEMS 06<br />

02 CONCE ALED FACTORY FIT TED LIF TING SYSTEMS 14<br />

03 ON SITE INSTALLED LIF TING SYSTEMS 18<br />

04 UNLOADING AND STOR AGE 19<br />

<strong>05</strong> INSTALL ATION 21<br />

0 1


P R E F A C E<br />

LIFTING<br />

SYSTEMS<br />

This brochure shall provide an overview of the different CE certified lifting systems for CLT panels that can be supplied and<br />

installed by <strong>KLH</strong> Massivholz GmbH. (<strong>KLH</strong> are currently the only CLT manufacturer that holds CE certification for their lifting<br />

systems.)<br />

There are various factors to consider when selecting a lifting system :<br />

the location of the element during transport, the type of panel installation/handling on site, the size of the element, the visual<br />

requirements for the <strong>KLH</strong> element and the cost of the lifting system.<br />

The following lifting systems are described on the subsequent pages:<br />

• flush mounted, visible and factory fitted lifting systems for wall, floor and roof elements<br />

• concealed, factory fitted lifting systems for wall, floor and roof elements<br />

• on site installed lifting systems<br />

In addition to a detailed description of the different lifting systems, their application and installation, this brochure also<br />

contains copies of the related CE certification.<br />

0 2


O V E R V I E W O F C E - C E R T I F I E D L I F T I N G S Y S T E M S<br />

W-System (Wall System)<br />

For wall elements -with single holes and disposable<br />

lifting slings<br />

F-<strong>Systems</strong> (Floor System)<br />

F D - s y s t e m ( f l o o r d i a g o n a l - s y s t e m )<br />

For floor and roof elements-with diagonally arranged<br />

holes and disposable lifting slings<br />

F B - S y s t e m ( F l o o r B o l T S y s t e m )<br />

For floor and roof elements-with single holes using<br />

disposable lifting slings and reusable safety bolts<br />

VLS -System (Visible lifting -System)<br />

For wall, floor and roof elements using disposable - lifting<br />

slings and pins<br />

Please also note the country-specific health and safety regulations for all<br />

lif ting systems and adhere to the relevant site specific personal protective<br />

equipment and construction equipment requirements and regulations.<br />

0 3


z e r t i f i k a t<br />

0 4


z e r t i f i k a t<br />

0 5


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

01 FLUSH MOUNTED, VISIBLE AND FACTORY FITTED LIFTING SYSTEMS<br />

Flush mounted, visible and factory fitted lifting systems<br />

are used for wall, floor and roof elements.<br />

According to the weight of the <strong>KLH</strong> elements disposable<br />

lifting slings of type 1000 Pewag or Pewag 2500 are used.<br />

A 30 mm diameter hole required for the insertion of the<br />

lifting strap will be visible. For exposed quality finish<br />

<strong>KLH</strong> surfaces, we recommend that following the element<br />

installation on site the lifting holes are plugged with<br />

timber plugs.<br />

Depending on the installation, we distinguish between<br />

the W-system, FD-system and FB-system.<br />

LIFTING SYSTEMS OVERVIEW<br />

System type<br />

<strong>Lifting</strong> sling type<br />

minimum panel thickness [mm]<br />

maximum panel thickness [mm]<br />

minimum number of lifting slings<br />

maximum number of lifting slings<br />

maximum panel weight [kg]<br />

with 1# lifting sling<br />

maximum panel weight [kg]<br />

with 2# lifting slings<br />

maximum panel weight [kg]<br />

with 3# lifting slings<br />

maximum panel weight [kg]<br />

with 4# lifting slings<br />

Panel handling<br />

W 1000 Pewag 1000 57 600 1 2 1000 2000 not permitted not permitted vertical<br />

W 2500 Pewag 2500 125 600 1 2 2500 5000 not permitted not permitted vertical<br />

FD 1000 Pewag 1000 57 600 1 4 1000 1000 1500 3000 horizontal<br />

FD 2500 Pewag 2500 125 600 1 4 2500 2500 3750 7500 horizontal<br />

FB 1000 Pewag 1000 57 600 1 4 1000 1000 1500 3000 horizontal<br />

FB 2500 Pewag 2500 125 600 1 4 2500 2500 3750 7500 horizontal<br />

E xample: Wall element 1600kg Required system: 2 pcs. W 1000<br />

Floor element 24 00kg Required system: 4 pcs. FB 1000 or FD 1000<br />

0 6


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

W-System<br />

(vertical panel handling of wall units)<br />

Angle of inclination<br />

45° - 60°<br />

ma x. 6m<br />

<strong>KLH</strong> wall element<br />

F-SystemS<br />

FD-system (horizontal handling of floor and<br />

roof elements - diagonally arranged holes)<br />

FB-system (horizontal panel handling of floor and<br />

roof elements – lifting sling with pin)<br />

<strong>KLH</strong> f loor element<br />

ma x. 6m<br />

Angle of inclination<br />

45° - 60°<br />

0 7


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R W A L L E L E M E N T S<br />

ILLUSTRATION OF VISIBLE FACTORY FITTED LIFTING SYSTEMS FOR WALL ELEMENTS (W-SYSTEM)<br />

EDGE DISTANCES W-SYSTEM<br />

The following illustrations identify the edge distance requirements for lifting holes within the wall panel.<br />

Standard Half Lap Slope cut<br />

½ ½<br />

130<br />

130<br />

80<br />

130<br />

<strong>KLH</strong> wall element<br />

80<br />

Ø30<br />

<strong>KLH</strong> wall element<br />

Ø30<br />

<strong>KLH</strong> wall element<br />

Ø30<br />

The holes for lifting slings will be incorporated into the fabrication drawings by <strong>KLH</strong>UK.<br />

The position of the hole for the lifting sling will depend on the edge distance, the balance point and the handling position<br />

of the <strong>KLH</strong> element. The specific lifting system type will normally be specified by <strong>KLH</strong>UK.<br />

The maximum distance between 2 lifting slings is 6,000mm.<br />

0 8


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R W A L L E L E M E N T S<br />

DIAGRAMATIC ILLUSTRATION OF THE SYSTEM W 1000<br />

Panel thickness ranging from 57 mm to 600 mm,<br />

1# lifting sling or 2# lifting slings<br />

1# lif ting sling -<br />

panel weight<br />

1,000 kg ma x.<br />

2# lif ting slings -<br />

panel weight<br />

2,000 kg ma x.<br />

<strong>KLH</strong> wall element<br />

<strong>KLH</strong> wall element<br />

DIAGRAMATIC ILLUSTRATION OF THE SYSTEM W 2500<br />

Panel thickness ranging from 125 mm to 600 mm,<br />

1# lifting sling or 2# lifting slings<br />

1# lif ting sling -<br />

panel weight<br />

2,500 kg ma x.<br />

2# lif ting slings -<br />

panel weight<br />

5,000 kg ma x.<br />

<strong>KLH</strong> wall element<br />

<strong>KLH</strong> wall element<br />

0 9


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R F L O O R A N D R O O F E L E M E N T S<br />

ILLUSTRATION OF THE VISIBLE FACTORY FITTED LIFTING SYSTEM FOR FLOOR<br />

AND ROOF ELEMENTS (F-SYSTEM)<br />

Within the F-system we distinguish between the FD- and the FB-system. The FD-system utilizes lifting slings; the FBsystem<br />

consists of lifting slings with metal pins.<br />

EDGE DISTANCE REQUIREMENTS OF THE F-SYSTEM<br />

Minimum<br />

edge dis t ance<br />

150<br />

Ø30<br />

The following diagrams illustrate the recommended minimum<br />

edge distances for the lifting holes.<br />

<strong>KLH</strong> f loor element<br />

protection for exposed<br />

qualit y sur f aces<br />

The holes for lifting slings will be incorporated into the fabrication drawings by <strong>KLH</strong>UK.<br />

The position of the hole for the lifting sling will depend on the edge distance, the balance point and the handling position<br />

of the <strong>KLH</strong> element. The specific lifting system type will normally be specified by <strong>KLH</strong>UK.<br />

Half Lap Standard Slope cut<br />

200<br />

Ø 30<br />

200 200<br />

Ø 30 Ø 30<br />

½ ½<br />

<strong>KLH</strong> f loor element<br />

<strong>KLH</strong> f loor element<br />

<strong>KLH</strong> f loor element<br />

protection for<br />

protection for<br />

protection for<br />

150<br />

exposed qualit y<br />

sur f aces<br />

exposed qualit y<br />

sur f aces<br />

150<br />

exposed qualit y<br />

sur f aces<br />

1 0


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R F L O O R A N D R O O F E L E M E N T S<br />

DIAGRAMMATIC ILLUSTRATION OF THE SYSTEMS FD 1000 / 1000 FB<br />

Panel thickness ranging from 57 mm to 600 mm<br />

1# <strong>Lifting</strong> sling or 2#, 3# or 4# <strong>Lifting</strong> slings<br />

1# lif ting sling -<br />

2# lif ting slings -<br />

panel weight<br />

panel weight<br />

1,000 kg ma x.<br />

1,000 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

<strong>KLH</strong> f loor element<br />

3 # lif ting slings -<br />

4 # lif ting slings -<br />

panel weight<br />

1,500 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

panel weight<br />

3,000 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

DIAGRAMMATIC ILLUSTRATION OF THE SYSTEMS FD 2500 / FB 2500<br />

Panel thickness from 125 mm to 600 mm,<br />

1# <strong>Lifting</strong> sling or 2#, 3# or 4# <strong>Lifting</strong> slings<br />

1# lif ting sling -<br />

panel weight<br />

2,500 kg ma x.<br />

2# lif ting slings -<br />

panel weight<br />

2,500 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

<strong>KLH</strong> f loor element<br />

3 # lif ting slings -<br />

panel weight<br />

3,750 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

4 # lif ting sling -<br />

panel weight<br />

7,500 kg ma x.<br />

<strong>KLH</strong> f loor element<br />

1 1


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R F L O O R A N D R O O F E L E M E N T S<br />

GENERAL COMMENTS REGARDING THE INSTALLATION OF THE DISPOSABLE LIFTING SLINGS<br />

The type of lifting system will be determined during the<br />

fabrication drawing procedure and usually ordered by<br />

<strong>KLH</strong>UK. Typically the lifting slings are installed in the<br />

factory.<br />

Exception: To load and unload vertically transported<br />

elements and panels with F-systems, lifting slings in<br />

the W-system will be fitted in the factory. For further<br />

handling of the panels, the supplied lifting system<br />

components for the F-system need to be installed on site<br />

(see also page 20).<br />

It is imperative that the lifting slings provided are installed<br />

strictly in accordance with the below illustrations.<br />

INSTALLATION OF LIFTING SLINGS FOR THE FD-SYSTEM<br />

1 Inser t the lif ting sling into the lif ting hole<br />

2 Pull the sling up again and through the second hole<br />

3 Lif ting situation with FD -system. Edge distance between holes 100 mm.<br />

Hole locations 45 degrees to the direction of the grain. See photo<br />

1 2


V I S I B L E F A C T O R Y F I T T E D L I F T I N G S Y S T E M S F O R F L O O R A N D R O O F E L E M E N T S<br />

INSTALLATION OF LIFTING SLINGS WITH THE FB-SYSTEM<br />

1 Inser t the lif ting sling into the lif ting hole<br />

2 Locate the met al pin and lif ting hook away f rom the seam of the<br />

lif ting sling<br />

3 Inser t the met al pin with the locking clip down and secure<br />

4 Lif ting situation with FB - system<br />

1 3


C O N C E A L E D F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

02 CONCEALED AND FLUSH FACTORY FITTED LIFTING SYSTEMS<br />

The VLS lifting system illustrated below is a lifting system<br />

<strong>KLH</strong> developed in-house. It is particularly suited for<br />

lifting <strong>KLH</strong> elements with exposed quality surfaces.<br />

The VLS-system is fully concealed and installed in the<br />

factory. After installation of the <strong>KLH</strong> element on site, the<br />

lifting sling can be cut off flush.<br />

OVERVIEW VLS LIFTING SYSTEM T YPES FOR WALL, FLOOR AND ROOF ELEMENTS<br />

System type<br />

Transport – loading type<br />

minimum panel thickness [mm]<br />

maximum panel thickness [mm]<br />

minimum number of lifting slings<br />

maximum number of lifting slings<br />

maximum panel weight [kg]<br />

with 1# lifting sling<br />

maximum panel weight [kg]<br />

with 2# lifting slings<br />

maximum panel weight [kg]<br />

with 3# lifting slings<br />

maximum panel weight [kg]<br />

with 4# lifting slings<br />

Panel handling<br />

VLS W1 horizontal/vertical 57 71 1 2 400 800 not permitted not permitted vertical<br />

VLS W1 D horizontal/vertical 57 71 1 2 800 1600 not permitted not permitted vertical<br />

VLS W2 horizontal/vertical 72 93 1 2 500 1000 not permitted not permitted vertical<br />

VLS W2 D horizontal/vertical 72 93 1 2 1000 2000 not permitted not permitted vertical<br />

VLS W3 horizontal/vertical 94 124 1 2 800 1600 not permitted not permitted vertical<br />

VLS W3 D horizontal/vertical 94 124 1 2 1600 3200 not permitted not permitted vertical<br />

VLS W4 horizontal/vertical 125 187 1 2 800 1600 not permitted not permitted vertical<br />

VLS W4 D horizontal/vertical 125 187 1 2 1600 3200 not permitted not permitted vertical<br />

VLS W5 horizontal/vertical 188 600 1 2 800 1600 not permitted not permitted vertical<br />

VLS W5 D horizontal/vertical 188 600 1 2 1600 3200 not permitted not permitted vertical<br />

VLS D1 horizontal 57 600 1 4 700 700 1400 2100 horizontal<br />

VLS D1 vertical 57 600 1 4 700 1400 1400 1400 vertical<br />

VLS D1 D horizontal 57 600 1 4 1400 1400 2800 4200 horizontal<br />

VLS D1 D vertical 57 600 1 4 1400 2800 2800 2800 vertical<br />

VLS D2 horizontal 90 600 1 4 1<strong>05</strong>0 1<strong>05</strong>0 2100 3150 horizontal<br />

VLS D2 vertical 90 600 1 4 1<strong>05</strong>0 2100 2100 2100 vertical<br />

VLS D2 D horizontal 90 600 1 4 2100 2100 4200 6300 horizontal<br />

VLS D2 D vertical 90 600 1 4 2100 4200 4200 4200 vertical<br />

VLS D3 horizontal 140 600 1 4 1750 1750 3500 5250 horizontal<br />

VLS D3 vertical 140 600 1 4 1750 3500 3500 3500 vertical<br />

VLS D3 D horizontal 140 600 1 4 3500 3500 7000 1<strong>05</strong>00 horizontal<br />

VLS D3 D vertical 140 600 1 4 3500 7000 7000 7000 vertical<br />

1 4


C O N C E A L E D F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

VLS -SYSTEM<br />

System VLS W2-fitted to a wall element<br />

Angle of inclination<br />

45° - 60°<br />

ma x. 6m<br />

<strong>KLH</strong> wall element<br />

VLS -System<br />

System VLS D2- fitted to a floor element<br />

<strong>KLH</strong> f loor element<br />

ma x. 6m<br />

Angle of inclination<br />

45° - 60°<br />

1 5


C O N C E A L E D F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

ILLUSTRATION OF CONCEALED FACTORY FITTED LIFTING SYSTEMS<br />

- THE VLS -SYSTEM FOR WALL, FLOOR AND ROOF ELEMENTS<br />

EDGE DISTANCES FOR THE VLS-SYSTEM<br />

Installation will be carried out in the <strong>KLH</strong> factory and<br />

exclusively in accordance with the edge distance requirements<br />

as described below.<br />

The 25 mm ø holes for lifting slings will be incorporated<br />

into the fabrication drawings by <strong>KLH</strong>UK.<br />

The position of the hole for the lifting sling will depend<br />

on the edge distance, the balance point and the handling<br />

position of the <strong>KLH</strong> element. The specific lifting system<br />

type will normally be specified by <strong>KLH</strong>UK.<br />

The maximum distance between 2 lifting slings is<br />

6,000mm.<br />

VLS-SYSTEM FOR VERTICAL PANEL HANDLING (e.g. WALL ELEMENTS)<br />

The following VLS-systems are available for vertical panel handling<br />

VLS W1 to VLS W5 and VLS W1 D to VLS W5 D<br />

For full details regarding the available VLS lifting systems please refer to the overview.<br />

Below an illustration of the edge distances for VLS W-systems:<br />

Standard<br />

Slope cut<br />

Half Lap<br />

½<br />

½<br />

130<br />

130<br />

80<br />

130<br />

80<br />

Ø25 Ø25 Ø25<br />

<strong>KLH</strong> wall element<br />

<strong>KLH</strong> wall element<br />

<strong>KLH</strong> wall element<br />

1 6


C O N C E A L E D F A C T O R Y F I T T E D L I F T I N G S Y S T E M S<br />

VLS LIFTING SYSTEM FOR HORIZONTAL PANEL HANDLING (e.g. FLOOR AND ROOF ELEMENTS)<br />

The following VLS-systems are available for horizontal panel handling<br />

VLS D1 to VLS D3 and VLS D1 D to VLS D3 D<br />

For full details regarding the available VLS lifting systems please refer to the overview.<br />

Below an illustration of the edge distances for VLS D-systems:<br />

Standard<br />

Slope cut<br />

Half Lap<br />

130<br />

Ø25<br />

130<br />

Ø25<br />

130<br />

Ø25<br />

<strong>KLH</strong> f loor / roof element<br />

<strong>KLH</strong> f loor / roof element<br />

½<br />

<strong>KLH</strong> f loor / roof element<br />

½<br />

80<br />

80<br />

INSTALLATIONWITH SINGLE OR DOUBLE LIFTING SLING<br />

Typically a single lifting sling is sufficient. For high load<br />

requirements a double sling arrangement can be installed.<br />

Example VLS W3<br />

Example VLS W3 D<br />

When lifting with the double sling arrangement it is<br />

imperative that the lifting hook is inserted into both slings.<br />

1 7


O N S I T E I N S T A L L E D L I F T I N G S Y S T E M S<br />

03 ON SITE INSTALLED LIFTING SYSTEMS<br />

Würth System<br />

The proprietary system consists of Assy Kombi screws<br />

and a lifting anchor in accordance with the enclosed data<br />

sheet.<br />

The Würth lifting system is only suitable for horizontal<br />

panel delivery and horizontal panel handling (e.g. floor<br />

panels), vertical handling is not permitted.<br />

The Assy Kombi screw needs to be installed in the pull<br />

direction of the crane chain. Diagonal pull forces are not<br />

permitted with this system.<br />

TRANSPORT ANCHOR<br />

with chain link and stop on cross<br />

bar<br />

In conjunction with the ASSY® 3.0<br />

Combi Screw, an expertise is<br />

available for the system<br />

Steel, yellow galvanized (A2C)<br />

Load<br />

level in<br />

tons<br />

Weight<br />

in kg<br />

a<br />

in<br />

mm<br />

c<br />

in<br />

mm<br />

d<br />

in<br />

mm<br />

e<br />

in<br />

mm<br />

f<br />

in<br />

mm<br />

g<br />

in<br />

mm<br />

h<br />

in<br />

mm<br />

Art. No. P.<br />

Qty.<br />

1.0-1.3 0.7 12 165 130 30 40 5 13 0184 000 13 2<br />

Function and application:<br />

• For transporting wooden components in<br />

conjunction with the ASSY ® 3.0 Combi<br />

Screw.<br />

• Any rotating, tilting and swiveling<br />

movement is possible and harmless even<br />

under load.<br />

• The transport anchor enables the safe,<br />

simple lifting o of all types of wooden<br />

components.<br />

• Expertise available. This is available<br />

at www.wuerth.de, in the section: My<br />

industry/Engineers, planners, architects/<br />

Approvals/.<br />

• The transport anchor complies with the<br />

Machine Directive (89/392/EEC) in the<br />

version 93/44/EEC.<br />

Maintenance<br />

• The transport anchor must be inspected<br />

by an expert/safety representative of the<br />

company at least once a year. In addition<br />

to damage of any kind, the degree of<br />

wearing must primarily be determined.<br />

• Modi cations and repairs, especially<br />

welding on the transport anchor are not<br />

permitted!<br />

• For safety reasons, the screws may only<br />

be used once.<br />

The permissible<br />

maximum limit<br />

dimension for the<br />

dimension "h" is 13 mm.<br />

If the limit dimension is<br />

exceeded, the anchor<br />

may no longer be used.<br />

h<br />

Recess: Depth 3 cm/dia. 70 mm<br />

MWF - 12/11 - <strong>07</strong>997 - ©<br />

The load-bearing capacity of the transport anchor in conjunction with<br />

the ASSY ® 3.0 Combi Screw must be proven separately –<br />

see test report/expertise.<br />

Screws: ASSY ® 3.0 Combi<br />

dia. 12 mm, Art. No. 0184 112 …<br />

Recommendation: 0184 212 181<br />

Total length just 180 mm<br />

Thread length 145 mm<br />

Installation and handling of the Würth system is to be carried out strictly in accordance with the manufacturers’ recommendations.<br />

1 8


U N L O A D I N G A N D S T O R A G E<br />

04 UNLOADING AND STORAGE<br />

GUIDELINES FOR W-SYSTEMS FOR VERTICAL AND HORIZONTAL TRANSPORT/HANDLING<br />

Use a high capacity lifting device (minimum diameter 10 mm) in accordance with EN 818-2.<br />

Please note the following procedures:<br />

• Visual inspection of the fitted disposable lifting slings<br />

• Hook in all lifting slings<br />

(please refer to illustration)<br />

• Maximum distance between the slings 6,000mm<br />

• Angle of the lifting mechanism 45° - 60°<br />

Hook into the lif ting slings<br />

Angle of inclination<br />

45° - 60°<br />

ma x. 6m<br />

<strong>KLH</strong> wall element<br />

Lif t the wall element f rom<br />

horizont al position<br />

Pull direction<br />

110°<br />

LKW<br />

Cargo securing system in accordance with the relevant rules and regulations<br />

1 9


U N L O A D I N G A N D S T O R A G E<br />

GUIDELINES FOR F- AND VLS -SYSTEMS FOR VERTICAL AND HORIZONTAL TRANSPORT/HANDLING<br />

Use a high capacity lifting device (minimum diameter 10 mm) in accordance with EN 818-2.<br />

Please note the following procedures:<br />

F L O O R S L A B - H O R I Z O N T A L T R A N S P O R T<br />

• Visual inspection of the fitted disposable lifting slings<br />

• Hook in all lifting slings<br />

(please refer to illustration)<br />

• Maximum distance between the slings 6,000mm<br />

• Angle of the lifting mechanism 45° - 60°<br />

<strong>KLH</strong> f loor element<br />

ma x. 6m<br />

Angle of inclination<br />

45° - 60°<br />

F L O O R S L A B - V E R T I C A L T R A N S P O R T/ H A N D L I N G<br />

Unloading procedure for F- and VLS-systems<br />

Angle of inclination<br />

45° - 60°<br />

The panels are unloaded using the factory installed lifting<br />

slings. The panel is then temporarily placed horizontally<br />

and secured.<br />

ma x. 6m<br />

<strong>KLH</strong> f loor element<br />

Onsite installation with the VLS-system<br />

The lifting gear is hooked into the factory installed lifting<br />

slings and the element lifted into position.<br />

Onsite installation with the F-system<br />

Following the unloading procedure with the F-system the<br />

supplied lifting slings are installed on site into all lifting<br />

holes and the element lifted into position (see installation<br />

<strong>KLH</strong> f loor element<br />

ma x. 6m<br />

Angle of inclination<br />

45° - 60°<br />

of F-system pages 12/13).<br />

2 0


I N S T A L L A T I O N<br />

<strong>05</strong> INSTALLATION<br />

VERTICAL ELEMENT INSTALLATION -<br />

WALL ELEMENTS<br />

HORIZONTAL ELEMENT INSTALLATION -<br />

FLOOR AND ROOF ELEMENTS<br />

I N S T A L L A T I O N O F W A L L E L E M E N T<br />

• Correctly position wall panel-note temporary stability<br />

requirements<br />

F L O O R / R O O F E L E M E N T I N S T A L L A T I O N<br />

• Install floor / roof element in correct position – note<br />

temporary stability requirements<br />

U N H O O K L I F T I N G G E A R<br />

temporar y<br />

suppor t<br />

• Follow the relevant occupational health and safety<br />

rules and regulations when installing floor and roof<br />


<br />

elements<br />

screw f ixings<br />

U N H O O K L I F T I N G G E A R<br />

• Follow the relevant occupational health and safety<br />

rules and regulations<br />


<br />

T H E V L S - S Y S T E M - C U T T I N G O F L I F T I N G S L I N G S<br />

• Wear safety gloves and use a safety knife strictly in<br />

accordance with the relevant Health and Safety rules<br />

and regulations<br />

temporar y<br />

suppor t<br />

screw f ixings<br />

D I S P O S A L O F L I F T I N G S L I N G S<br />

• EWC 200 139 plastics from household waste<br />

• CFC 170 203 plastic from construction and demolition<br />

waste<br />

• According to EU - waste disposal of non-recyclable<br />

waste<br />

2 1


N O T E S


N O T E S


N O T E S


K L H M a s s i v h o l z G m b H<br />

A-8842 Katsch a. d. Mur 202 | Tel +43 (0)3588 8835 0 | Fax +43 (0)3588 8835 20<br />

of fice@klh.at | www.klh.at<br />

K L H U K L t d .<br />

7-9 Woodbridge Street | London EC1 R0LL<br />

tel: +44 (0)20 3031 8<strong>07</strong>0 | fax: +44(0)20 7336 8152<br />

of fice@klhuk.com | www.klhuk.com<br />

www.pefc.at<br />

www.fsc.org<br />

For love of nature.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!