5. Establish Soil Defaults Select Defaults from the Hydrology\Soil Menu. If Soil Default data does not exist for this project, then the County default Table will be loaded. The user can then modify the data to establish different defaults to be used for this project. If it is necessary to add new data, then do it in the same manner as adding new records for the Land Use Defaults. The following view is shown in Browse mode. 6. Establish Land Use Data Select Data from the Hydrology\Land Use Menu. Add or Copy records to populate the necessary data as shown below. It is only necessary to add the Sub Basin ID, select the Land Use and add the Area in square miles. Then click to populate the Default Values. If a non-default value is used, it will be necessary to check the adjacent Custom box. Values with adjacent Custom box checked will not be updated. Be sure to enter land use data for each Sub Basin ID in this Project and make sure there is sufficient land use data to cover the entire Sub Basin. KVL Consultants, Inc Drainage Design Management System – User’s Manual 92-38.doc Ex-5
7. Establish Soil Data Select Data from the Hydrology\Soil Menu. Add or Copy records to populate the necessary data as shown below. It is only necessary to add the Sub Basin ID, select the Map Unit and add the Area in square miles. Then click to populate the Default Values. If a non-default value is used, it will be necessary to check the adjacent Custom box. Values with adjacent Custom box checked will not be updated. Be sure to enter soil data for each Area ID in this Project and make sure there is sufficient soil data to cover the entire Area ID’s area. 8. Establish Major Basin Select Major Basins from the Hydrology\Basins Menu. Add or Copy records to populate the necessary data as shown below. Each hydrology model run will be for a unique Major Basin ID. Select 01 for the first basin, 02 through 99 for other Major Basins. KVL Consultants, Inc Drainage Design Management System – User’s Manual 92-38.doc Ex-6
- Page 1 and 2: FLOOD CONTROL DISTRICT of MARICOPA
- Page 3 and 4: Table of Contents (Cont’d) 6. GIS
- Page 5 and 6: A table also consists of one or mor
- Page 7 and 8: 2. General Features Main Menu The M
- Page 9 and 10: Marks the current record for deleti
- Page 11 and 12: Open To open an existing project, m
- Page 13 and 14: Backup Project Use this option to b
- Page 15 and 16: 4. Hydrology Rainfall Prefre The se
- Page 17 and 18: There are three columns in the Soil
- Page 19 and 20: It is important to enter appropriat
- Page 21 and 22: Distributions Time-Area The selecti
- Page 23 and 24: Edit HEC-1 Data This selection allo
- Page 25 and 26: 5. Hydraulics To be developed KVL C
- Page 27 and 28: 7. Utilities Export Data The select
- Page 29 and 30: good practice is to first export a
- Page 31 and 32: 8. Help and Window Help About This
- Page 33 and 34: 1. Establish Path for Model Runs Cr
- Page 35: 4. Establish Land Use Defaults Sele
- Page 39 and 40: 11. Develop Draft HEC-1 Input File
- Page 41: 13. Run HEC-1 Model Select Run HEC-
7. Establish Soil Data<br />
Select Data from the Hydrology\Soil Menu. Add or Copy records to populate the<br />
necessary data as shown below. It is only necessary to add the Sub Basin ID, select the<br />
Map Unit and add the Area in square miles. Then click<br />
to populate the Default<br />
Values. If a non-default value is used, it will be necessary to check the adjacent Custom<br />
box. Values with adjacent Custom box checked will not be updated.<br />
Be sure to enter soil data for each Area ID in this Project and make sure there is sufficient<br />
soil data to cover the entire Area ID’s area.<br />
8. Establish Major Basin<br />
Select Major Basins from the Hydrology\Basins Menu. Add or Copy records to populate<br />
the necessary data as shown below. Each hydrology model run will be for a unique Major<br />
Basin ID. Select 01 for the first basin, 02 through 99 for other Major Basins.<br />
KVL Consultants, Inc<br />
<strong>Drainage</strong> <strong>Design</strong> <strong>Management</strong> <strong>System</strong> – User’s <strong>Manual</strong><br />
92-38.doc<br />
Ex-6