Installation and System Requirements - O&O Software
Installation and System Requirements - O&O Software
Installation and System Requirements - O&O Software
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Creating A New Job<br />
Schedule<br />
On the scheduling page, you can define the time at which the job should be carried out. You<br />
can run the job just once, weekly or even automatically. The options change according to<br />
the frequency you’ve chosen.<br />
You can also enter advanced options. The start <strong>and</strong> end dates let you define the period over<br />
which the job should be carried out. The maximum running time limits the running of a job<br />
to a particular time frame, after which the job will stop whether it has finished or not. The job<br />
will then start from where it left off when the next defragmentation run begins.<br />
If you want a job to be run more than once a day, enter the required time interval under<br />
Advanced/Start date.<br />
The option of starting the job later if a defragmentation is not possible at a given time is<br />
intended for systems that are not always on. Normally, the job would simply be left out if the<br />
computer is switched off. If this option is enabled, the defragmentation will be run whenever<br />
the computer is switched back on. This ensures that your job won’t be left out.<br />
User's Guide for O&O Defrag 11<br />
Automatic Defragmentation l 33