17.04.2015 Views

Installation and System Requirements - O&O Software

Installation and System Requirements - O&O Software

Installation and System Requirements - O&O Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Creating A New Job<br />

Schedule<br />

On the scheduling page, you can define the time at which the job should be carried out. You<br />

can run the job just once, weekly or even automatically. The options change according to<br />

the frequency you’ve chosen.<br />

You can also enter advanced options. The start <strong>and</strong> end dates let you define the period over<br />

which the job should be carried out. The maximum running time limits the running of a job<br />

to a particular time frame, after which the job will stop whether it has finished or not. The job<br />

will then start from where it left off when the next defragmentation run begins.<br />

If you want a job to be run more than once a day, enter the required time interval under<br />

Advanced/Start date.<br />

The option of starting the job later if a defragmentation is not possible at a given time is<br />

intended for systems that are not always on. Normally, the job would simply be left out if the<br />

computer is switched off. If this option is enabled, the defragmentation will be run whenever<br />

the computer is switched back on. This ensures that your job won’t be left out.<br />

User's Guide for O&O Defrag 11<br />

Automatic Defragmentation l 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!