<strong>Earned</strong> <strong>Schedule</strong> Predictors<br />

• Can the project be completed as planned?<br />

• TSPI = Plan Remaining / Time Remaining<br />

= (PD – ES) / (PD – AT)<br />

where (PD – ES) = PDWR<br />

PDWR = Planned Duration for Work Remaining<br />

• TSPI = (PD – ES) / (ED – AT)<br />

where ED = Estimated Duration<br />

EVA-11<br />

Jun 12-17, 17, 2006<br />

TSPI Value<br />

≤ 1.00<br />

> 1.10<br />

Predicted Outcome<br />

Achievable<br />

Not Achievable<br />

Copyright 2006<br />

Lipke & Henderson 21