Earned Schedule Training

Earned Schedule Training Earned Schedule Training

earnedschedule.com
from earnedschedule.com More from this publisher
12.04.2015 Views

Earned Schedule Concept BCWP SPI($) = BCWS SV($) = BCWP − BCWS BCWS ES SPI(t) = AT SV(t) = ES − AT Projection of BCWP onto BCWS $ BCWP ES ES AT = All of May + Portion of June BCWP($) - BCWS(May) = 5 + BCWS(June) - BCWS(May) = 7 J F M A M J J A S O N Time EVA-11 Copyright 2006 Jun 12-17, 17, 2006 Lipke & Henderson 14

Earned Schedule Metrics • Required measures • Performance Management Baseline (PMB) – the time phased planned values (BCWS) from project start to completion • Earned Value (BCWP) – the planned value which has been “earned” • Actual Time (AT) - the actual time duration from the project beginning to the time at which project status is assessed • All measures available from EVM EVA-11 Jun 12-17, 17, 2006 Copyright 2006 Lipke & Henderson 15

<strong>Earned</strong> <strong>Schedule</strong> Concept<br />

BCWP<br />

SPI($) =<br />

BCWS<br />

SV($)<br />

=<br />

BCWP<br />

−<br />

BCWS<br />

BCWS<br />

ES<br />

SPI(t) =<br />

AT<br />

SV(t)<br />

=<br />

ES<br />

−<br />

AT<br />

Projection of BCWP<br />

onto BCWS<br />

$<br />

BCWP<br />

ES<br />

ES<br />

AT<br />

=<br />

All<br />

of<br />

May<br />

+<br />

Portion<br />

of<br />

June<br />

BCWP($)<br />

-<br />

BCWS(May)<br />

=<br />

5<br />

+<br />

BCWS(June)<br />

-<br />

BCWS(May)<br />

=<br />

7<br />

J F M A M<br />

J J<br />

A S O N<br />

Time<br />

EVA-11<br />

Copyright 2006<br />

Jun 12-17, 17, 2006<br />

Lipke & Henderson 14