Earned Schedule Training
Earned Schedule Training Earned Schedule Training
Statistical Process Control 1.5 1 0.5 ln(SPI) 0 anomaly < lnSPI t > u= 0.994 σ=0.266 +3σ -0.5 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Months -3σ EVA-11 Jun 12-17, 17, 2006 Copyright 2006 Lipke & Henderson 122
Planning for Risk • Risk mitigation ⇒ Schedule Reserve • Data needed • Performance variation from similar historical project [Standard Deviation = σ H ] • Planned Duration of new project [provides the number of performance observations (n)] • Variation of Means (ln( SPI(t) -1 m ) = σ H / √ n = σ m • Probability of Success Desired (PS) EVA-11 Jun 12-17, 17, 2006 Copyright 2006 Lipke & Henderson 123
- Page 71 and 72: Earned Schedule - Re-Baseline Examp
- Page 73 and 74: Critical Path Study EVA-11 Jun 12-1
- Page 75 and 76: EVA-11 Jun 12-17, 17, 2006 The Sche
- Page 77 and 78: To further compound schedule comple
- Page 79 and 80: Case Study Project • Commercial s
- Page 81 and 82: Schedule Management • Weekly sche
- Page 83 and 84: • Initial expectation EVA-11 Jun
- Page 85 and 86: The IECD vs Critical Path Predictor
- Page 87 and 88: Questions of Scale • We know that
- Page 89 and 90: Final Thoughts • ES is expected b
- Page 91 and 92: Schedule Analysis with EVM? • The
- Page 93 and 94: Earned Schedule Bridges EVM to “R
- Page 95 and 96: BREAK - 15 Minutes EVA-11 Jun 12-17
- Page 97 and 98: Earned Value Research • Most rese
- Page 99 and 100: EVA-11 Jun 12-17, 17, 2006 Discussi
- Page 101 and 102: Schedule Adherence EVA-11 Jun 12-17
- Page 103 and 104: Schedule Adherence • Result from
- Page 105 and 106: Schedule Adherence • Characterist
- Page 107 and 108: Effective Earned Value Effective EV
- Page 109 and 110: Effective EV Relationships • Rewo
- Page 111 and 112: Effective Earned Value • Effectiv
- Page 113 and 114: Graphs of CPI & SPI(t) with the P -
- Page 115 and 116: Forecasting with Effective Earned V
- Page 117 and 118: EVA-11 Jun 12-17, 17, 2006 Summary:
- Page 119 and 120: Statistical Prediction • Statisti
- Page 121: Statistical Process Control • SPC
- Page 125 and 126: Performance Indication & Analysis
- Page 127 and 128: Outcome Prediction • Apply SPC to
- Page 129 and 130: Summary - Advanced EVA-11 Jun 12-17
- Page 131 and 132: Summary - Advanced • ES connects
- Page 133 and 134: Question #1 • What is the problem
- Page 135 and 136: Question #3 • What elements are r
- Page 137 and 138: Question #5 • The equation for Ea
- Page 139 and 140: Question #7 • Earned Schedule can
- Page 141 and 142: Question #9 • What does the P-Fac
- Page 143 and 144: Wrap-Up EVA-11 Jun 12-17, 17, 2006
- Page 145 and 146: Wrap Up • Schedule prediction - m
- Page 147: Contact Information Walt Lipke Kym
Planning for Risk<br />
• Risk mitigation ⇒ <strong>Schedule</strong> Reserve<br />
• Data needed<br />
• Performance variation from similar historical project<br />
[Standard Deviation = σ H ]<br />
• Planned Duration of new project [provides the<br />
number of performance observations (n)]<br />
• Variation of Means (ln(<br />
SPI(t) -1<br />
m ) = σ H / √ n = σ m<br />
• Probability of Success Desired (PS)<br />
EVA-11<br />
Jun 12-17, 17, 2006<br />
Copyright 2006<br />
Lipke & Henderson 123