Case History<br />

<strong>DIRECT</strong> <strong>PAK</strong> <strong>Ultra</strong> <strong>Screen</strong> <strong>System</strong> <strong>Successfully</strong><br />

Deployed for Cased-Hole Completion<br />

Completed gravel-pack operation in Equatorial Guinea<br />

Benefits<br />

• Bypass of premature bridging<br />

• Complete gravel pack around screen<br />

• Remaining gravel transported to<br />

unpacked areas<br />

Background and challenges<br />

• Equatorial Guinea, West Africa<br />

• Highly deviated well<br />

• Avoiding premature bridging<br />

<strong>Baker</strong> <strong>Hughes</strong> solution and results<br />

• <strong>DIRECT</strong> <strong>PAK</strong> ultra multi-path<br />

screen technology system pumped<br />

with radioactive tracers<br />

• Successful transport of gravel pack<br />

along entire interval length as<br />

depicted in the gamma ray log of<br />

the radioactive tracers<br />

In a cased-hole operation in<br />

Equatorial Guinea, Africa, an<br />

operator sought to deploy a gravelpack<br />

operation in a highly deviated<br />

well while avoiding any premature<br />

bridging. Such premature bridging<br />

can leave voids throughout<br />

the gravel pack. These voids in<br />

downhole assemblies can lead<br />

to formation production, fines<br />

migration, formation collapse and<br />

other destructive events.<br />

<strong>Baker</strong> <strong>Hughes</strong> recommended using<br />

the <strong>DIRECT</strong> <strong>PAK</strong> ultra multi-path<br />

screen technology system. The<br />

<strong>DIRECT</strong> <strong>PAK</strong> ultra screen technology<br />

requires tubes located on the<br />

outside diameter of the screen<br />

to allow bypass of premature<br />

bridging to ensure a complete<br />

gravel pack around the screen. If<br />

premature bridging were to occur,<br />

the remaining gravel would be<br />

transported to areas in the zone<br />

that remained unpacked.<br />

Lower zone tracer log


Pumped with radioactive tracers, the final<br />

annular pack was measured to determine if a<br />

100% pack occurred. Different radioactive tracers<br />

were used during each stage of the gravel pack.<br />

Tracers were put into early stages and placed<br />

deepest into the wellbore and perforations,<br />

followed by the next tracer type. If the tubes<br />

engaged, the tracers located voids and<br />

indicated bypass.<br />

The job was completed, pumping approximately<br />

7,500 lb (3402 kg) of proppant into the<br />

perforations and around the screen. After<br />

reviewing the pumping schedule, the pump<br />

rate remained around 5 bbl/min (0.002 m 3 /s),<br />

ideal for pumping through the bypass tubes.<br />

There were also pressure increases present<br />

during the schedule. Both of these events<br />

indicated that premature bridging could have<br />

occurred, and the gravel was diverted into the<br />

tubes to pack the remainder of the job.<br />

Pressure (psi)<br />

4,500<br />

3,600<br />

2,700<br />

1,800<br />

900<br />

0<br />

0<br />

CHGP versus Time<br />

15<br />

12<br />

9<br />

6<br />

3<br />

0<br />

10 20 30 40 50 60 70 80<br />

Time (min)<br />

Tubing P Annulus P Rate Actual ppa DH ppa<br />

Rate (BPM)/Density (PPA)<br />

The gravel was successfully transported<br />

throughout the entire interval length using<br />

the <strong>DIRECT</strong> <strong>PAK</strong> ultra screen technology.<br />

www.bakerhughes.com<br />

Disclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, <strong>Baker</strong> <strong>Hughes</strong> Incorporated and its affiliates do<br />

not make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including<br />

those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished “as is”<br />

and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE<br />

LIABLE FOR ANY <strong>DIRECT</strong>, IN<strong>DIRECT</strong>, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.<br />

© 2011 <strong>Baker</strong> <strong>Hughes</strong> Incorporated. All rights reserved. 29560

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!